Laserfiche WebLink
permit. (Development Title Section 9-1145.5) <br /> f. The access gate for the driveway on Ray Road shall remain open during all hours of operation. <br /> g. All vehicular parking related to applicant's winery shall be onsite at all times. Parking in the County <br /> and State rights-of-way for all winery related events shall be prohibited. It is the responsibility of <br /> applicant to monitor Ray Road and State Route 12 to ensure compliance with this requirement. <br /> h. if any marketing events aFe held for meFe than 150 people, the Department of RubliG VVOFks <br /> resewes the right to require a tFaffiG study te detem;ine the irnpaGts and mitigation of the prepes <br /> �Gt. The appliGaRt shall deposit funds with the Geunty for all GGStS, as estimated by the <br /> i. The property owner shall execute an Irrevocable Offer and Agreement to Dedicate Road to result <br /> in a twenty-five (25) foot wide right-of-way from the centerline of Ray Road to the property line <br /> across the frontage of APN's 055-160-29, 41 & 50. (A fee based on the current fee schedule is <br /> required for processing per Development Title Table 9-240.2 in addition to a copy of the Grant <br /> Deed of the subject property.) (Development Title Section 9-1150.5) <br /> j. The property owner shall execute an Irrevocable Offer and Agreement to Dedicate Road to result <br /> in a sixty foot (60') wide right-of-way for the future extension of DeBroggi Road across APN 055- <br /> 160-41. (A fee based on the current fee schedule is required for processing per Development Title <br /> Table 9-240.2 in addition to a copy of the Grant Deed of the subject property.) (Development Title <br /> Section 9-1150.5) (Development Title Section 9-1150.5 <br /> k. For each phase of the project, the developer shall provide drainage facilities and meet the <br /> requirements of San Joaquin County Development Standards. Retention basins shall be fenced <br /> with six (6) foot high chain link fence or equal when the maximum design depth is 18 inches or <br /> more. Required retention basin capacity shall be calculated and submitted along with a drainage <br /> plan for review and approval, prior to release of building permit. (Development Title Section 9-1135) <br /> I. The Traffic Impact Mitigation Fee shall be required for each phase of this development. The fee is <br /> due and payable at the time of building permit application for each phase. The fee will be based <br /> on the current schedule at the time of payment. The fee shall be automatically adjusted July 1 of <br /> each year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record. (Resolutions R-00-433) <br /> m. The Regional Transportation Impact Fee shall be required for each phase of this development. The <br /> fee is due and payable at the time of building permit application for each phase. The fee will be <br /> based on the current schedule at the time of payment. (Resolution R-06-38) <br /> n. A copy of the Final Site Plan shall be submitted prior to release of building permit for each phase <br /> of this development. <br /> o. For all phases of this development, applicant shall file Permit Registration Documents (PRD) with <br /> the State Water Resources Control Board(SWRCB),and submit the Waste Discharge Identification <br /> Number(WDID) issued by SWRCB to the Department of Public Works. <br /> p. Eliminate the eastern State Route 12 driveway immediately adjacent to Ray Road. <br /> Note: A Solid Waste Diversion Plan for all applicable projects must be submitted to the Building <br /> Division of the Community Development Department prior to the issuance of the building permit. <br /> Contact the Solid Waste Division (468-3066)for information. <br /> This property is subject to the requirements of San Joaquin County Mosquito & Vector Control <br /> PA-1300118 (UP, RAA) Conditions of Approval 5 <br />