Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br /> THOMAS R. FLINN <br /> DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> P. O. BOX 1810- 1810 EAST HAZELTON AVENUE MANUEL LOPEZ <br /> STOCKTON,CALIFORNIA 95201-1810 DEPUTY DIRECTOR <br /> 209/468-3000 STEVEN WINKLER <br /> F o FAX:209/468-2999 DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> February 20, 1997 RECEF1VEJ <br /> MEMORANDUM <br /> FEB 2 0 1997 <br /> OmmUnll�keV <br /> TO: Thomas M. Gau, Senior Civil Engineer eiopment Dept. <br /> Community Development Department <br /> CONTACT PERSON: Kerry Sullivan <br /> FROM: Tom M. Iwamiya, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: SA-97-3 A SITE APPROVAL APPLICATION FOR A FARM HEADQUARTERS FACILITY <br /> TO INCLUDE A 90-FOOT BY 70-FOOT BUILDING FOR TWO OFFICES AND FOR THE <br /> REPAIR AND SERVICING OF FARM EQUIPMENT. THE PROJECT ALSO INCLUDES <br /> AN EXISTING 100 SQUARE FOOT SHED AND AN EXISTING 4,000 SQUARE FOOT <br /> POLE BARN, LOCATED ON THE EAST SIDE OF RAY ROAD, ONE-HALF MILE NORTH <br /> OF ACAMPO ROAD. (DISTRICT 4). <br /> APPLICANT: Lydia Maggio APN: 013-020-31 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard <br /> Area. <br /> Ray Road has an existing right-of-way width of 50 feet and a planned right-of-way width of 50 feet. <br /> RECOMMENDATIONS: <br /> 1 . Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Section 9-1145.4) <br /> 2. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and payable <br /> at the time of building permit application. (The fee currently is $544.00 per 1,000 gross square <br /> foot of building as Manufacturing or $141 .37 per daily trip-end generated in the Lodi area. The fee <br /> shall be automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record.) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-174 and R-95-650) <br /> TMI:RWH:ti <br /> PS-78135.A <br /> E: Manuel Lopez, Deputy Director/Development <br />