Ntj/1L/05 11:217 BHblU KtbUUNCE � 20''J4bH_51b3 NO.707 P06 <br /> MUNN&PERKINS <br /> RECLAMATION PLAN <br /> PAGE FIVE <br /> III. DESCRIPTIONOF PROPOSED RECLAMATION,CONTINUED <br /> B. Reclamation Sched PrP• <br /> I. Reclamation is concurrent with mining. Topsoil is continuously replaced as <br /> excavation allows, 'Due to the size of the project;only one phase is proposed. <br /> 2—4 years for excavation and reclamation has been requested. Operator fully <br /> expects the reclamation can be completed sooner if weather and supply and <br /> demand does not change substantially. <br /> 2. Reclamation Site Plan indicates acreage for one phase. <br /> 3. Reclamation is concurrent with mining. <br /> C. Post Mining Topography- <br /> I. Map of proposed post-reclamation topography prepared by engineer is <br /> provided on engineered drawings. <br /> 2. Reclamation Site Plan showing cross sections, Slopes,cuts,fills, etc, is <br /> provided on engineered drawings. <br /> 3. Slopes can be stabilized,if necessary,by using resident hybrid erosion <br /> control seed mix. <br /> 4. Working slopes will not exceed 1:1. Final slopes will not exceed 2:1. <br /> S. Slopes of this design are very safe. <br /> D. Impoundments: There will be no impoundments on-site during this project <br /> E. Drainage- Any drainage due to sever storms will remain on-site. Due to the rapid <br /> penneability of the soil,drainage is not generally a concern during excavation and <br /> after reclamation <br /> F. osit on of Old Euuipment All equipment used at site will be mobile. <br /> G. Revegelation: <br /> 1.Topsoil is continuously replaced after sand material has been removed <br /> during excavation. When all sand has been removed and the topsoil replaced the site <br /> will be ripped,graded and leveled in preparation for planting trees, <br /> a, Average thickness of replaced topsoil at the mine site will be <br /> 10 tt-feet. <br /> b. Testing of soil will be performed by Farm Contractor if needed. <br /> c. Planting of trees occurs during spring. The trees are protected at <br /> time of planting from wind.Erosion does not occur due to the <br /> permeability of the soil. All planting is under supervision of Farm <br /> Contractor who contracts will,owner for planting, maintenance <br /> and harvesting. <br /> 2. Tree Fertilizer: Fertilizer mixture of21-7-14 is applied by hundful per <br /> irec one month after planting. The trees are fertilized as needed 4x a <br /> year by Farm Contractor <br />