My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007300
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
26292
>
2600 - Land Use Program
>
QX-89-0002
>
SU0007300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 3:08:38 PM
Creation date
9/9/2019 9:06:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007300
PE
2656
FACILITY_NAME
QX-89-0002
STREET_NUMBER
26292
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
APN
24722019
ENTERED_DATE
7/29/2008 12:00:00 AM
SITE_LOCATION
26292 E RIVER RD
RECEIVED_DATE
7/28/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\26292\QX-890002\SU0007300\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
629
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br /> 8. Setbacks: Excavation shall be restricted to the area designated on the approved site plan and shall be <br /> restricted further by the conditions of approval of the permit. <br /> 9. Slopes:Working.olopes shall be no steeper than 2:1 (horizontal-to-vertical). If, after one year or more of <br /> excavation, the 6epartment of Public Works determines that the approved slopes are unstable, the Planning <br /> Commission may adopt stricter slope requirements for future excavation and require the applicant to correct <br /> past slope deterioration. <br /> 10. Fencing: Fencing fiour feet in height and consisting of not less than three strands of barbed wire, or an <br /> approved equivalent, shall be placed around the excavation area where slopes steeper than two feet <br /> horizontal to oneloot vertical are maintained. Six-foot high security fencing or an approved equivalent shall <br /> be required whelk,slopes steeper than two feet horizontal to one foot vertical are created if the proximity of <br /> such slopes to residential uses or other uses involving a concentration of people so warrants. <br /> 11. Screening:Vegetative screening is not required unless the surrounding land is redesigned from agriculture to <br /> residential, as shown by the County General Plan. <br /> 12. Ponding: All water utilized in processing operations, and all surface runoff generated as a result of uncovering <br /> the natural groundcover, shall be directed to approved retention ponds. No processed water, sediment, or <br /> excavation-related surface runoff shall be allowed to enter any permanent or seasonal streams, including the <br /> slough located or adjacent to the project site. <br /> 13. Rehabilitation Schedule: The project site shall be excavated and rehabilitated in compliance with the <br /> excavation and rehabilitation schedule approved by the Planning Commission. <br /> 14. Duration of Approval: The permit is approved for thirty(30) years from the date of approval of the Revision of <br /> Approved Actions=: The permit shall lapse and become void except for its rehabilitation requirements if <br /> operations are discontinued for a period of at least eighteen months. <br /> 15. Inspection of the Operation:The applicant shall pay to San Joaquin the adopted fee to cover periodic permit <br /> compliance inspection by County staff. <br /> 16. Revocation: If it 4pears, on the basis of one permit compliance inspection, that operations are in violation of <br /> the approved per.Fpit,the Planning Commission shall conduct a permit revocation hearing. <br /> S1, <br /> 17. Guarantee of Performance: Prior to the commencement of operations, the applicant shall provide to San <br /> Joaquin County a financial guarantee to ensure rehabilitation of the site and compliance with conditions of <br /> approval. The applicant shall provide an itemized estimate for the amount of the guarantee,which amount is <br /> subject to the approval of the Department of Public Works.The applicant shall specify the form of the <br /> guarantee proposed; this form is subject to the approval of County Counsel. <br /> Conditions of Approval <br /> 1. Planning Division; <br /> a. The recycling plant shall not accept or produce waste materials which are not"inert waste," using the <br /> criteria set forth in Title 23, California Code of Regulations, Chapter 3, and Subchapter 15. <br /> b. All unprocessed recycling materials shall be removed from the site and disposed of properly, and all <br /> recycling,opparatus shall be removed from the site prior to the completion of excavation. <br /> c. The rehabilitation of the entire project site for agricultural use shall be completed within two years <br /> after the completion of the excavation <br /> San Joaquin County.' QX-89-0002/Aggregates Inc. <br /> Community Development Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.