My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007300
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
26292
>
2600 - Land Use Program
>
QX-89-0002
>
SU0007300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 3:08:38 PM
Creation date
9/9/2019 9:06:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007300
PE
2656
FACILITY_NAME
QX-89-0002
STREET_NUMBER
26292
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
APN
24722019
ENTERED_DATE
7/29/2008 12:00:00 AM
SITE_LOCATION
26292 E RIVER RD
RECEIVED_DATE
7/28/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\26292\QX-890002\SU0007300\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
629
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Basis for Selection <br /> The No Project Alternative is included in the EIR because the CEQA Guidelines, Section <br /> 15126.6(e)(1),require that an EIR evaluate a"no project'alternative along with its impact in <br /> order to provide a comparison of the impacts of approving the proposed project with the impacts <br /> of not approving the proposed project. Pursuant to CEQA Guidelines, Section 15126.6(e)(3)(B), <br /> the No Project Alternative discusses "the property remaining in its existing state." <br /> Distinctive Environmental Characteristics <br /> The following summarizes potential impacts of the "No Project' alternative and compares them <br /> to the impacts of the proposed project: <br /> Visual and Lighting <br /> Under the No Project Alternative, no physical change would occur at the project site and <br /> potential visual impacts related to additional safety lighting would be avoided. <br /> Traffic and Circulation <br /> Under the No Project Alternative, local traffic conditions would remain the same to those <br /> experienced at the current time. Project related truck traffic would be limited to the hours of 5 <br /> a.m.to 9 p.m. and traffic from 9 p.m. to 5 a.m. would be avoided. <br /> Air Quality and Climate Change <br /> Under the No Project Alternative,air emissions from the existing operation,including haul trucks, <br /> would be the same as those experienced at the current time. Nighttime concerns regarding potential <br /> odor effects would be avoided,but normal operations including production of rubberized and non- <br /> rubberized asphalt would continue during the day. <br /> Noise <br /> Under the No Project Alternative,there would be no new nighttime noise sources in the vicinity of <br /> the project site. Existing on-site and off-site noise sources during the hours of 5 a.m. to 9 p.m. <br /> would continue. <br /> Consideration of the No Project Alternative <br /> The No Project alternative would not meet any of the basic Project Objectives stated in Section <br /> B-1 (and Chapter 2 of the Final EIR). In order to meet local demand for highway construction <br /> projects,material may be hauled from outside of the County. On a regional level,this may result <br /> in increased air emissions, including GHG. <br /> Findings: <br /> Based on the above, and on the whole record, this Commission finds that the No-Project <br /> Alternative results in no significant impacts because no operational changes would occur at the <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.