My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004096
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
27865
>
2600 - Land Use Program
>
PA-0200370
>
SU0004096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:30 AM
Creation date
9/9/2019 9:06:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004096
FACILITY_NAME
PA-0200370
STREET_NUMBER
27865
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
27865 E RIVER RD
RECEIVED_DATE
10/4/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\APPL.PDF \MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\CDD OK.PDF \MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.i k&LAMATION PLAN—Bellino Pit <br /> George Reed,Inc. <br /> Page 3 <br /> I. DESCRIPTION OF ENVIRONMENTAL SETTING (continued) <br /> I. Aesthetics <br /> The area around the project site is primarily rural farmland and ranchettes. The immediate area <br /> between the proposed mine site and the processing facility is all farmland. Visual impact to vehicular <br /> traffic driving by will be limited to Phase I when excavation activities begin along the periphery of <br /> River Road and Harrold Avenue. Once Phase 11 commences, Phase I will be planted with Almond trees <br /> and the remainder of the project along River Road will be relatively obscured from public view. <br /> J. Other Information <br /> A South San Joaquin Irrigation District underground pipeline crosses through the property. Presently, <br /> the pipeline will remain as mapped out on the Site Plan, with an over-crossing constructed to <br /> accommodate haul traffic. Refer to Section 11. (K) [Page 5] of this plan for further information <br /> regarding this matter. <br /> II. DESCRIPTION OF PROPOSED MINING OPERATION <br /> A. Map Of Operations <br /> Details of the proposed operation are shown on map attached to the application. <br /> B. Estimated Production Schedule ' <br /> PHASE I: Product Completion Reclamation <br /> ±30 Acres 925,000 CY S/G 2007 2009 <br /> 537,000 CY OB <br /> PHASE H: <br /> t15 Acres 425,000 CY S/G 2009 2011 <br /> 278,000 CY OB <br /> PHASE HI: 1,080,000 CY S/G 2013 2015 <br /> ±26 Acres 495,000 CY OB <br /> PROJECT TOTALS: 2,430,000 CY S/G <br /> 1,310,000 CY OB <br /> NOTE. Annual Average Mining Quantities- 7.0 Acres/Year <br /> 131,000 CY Overburden/Year <br /> 243,000 CYSand& Gravel/Year <br />
The URL can be used to link to this page
Your browser does not support the video tag.