�.. KE6LAMA770NPL4N—Bellino Pit <br /> George Reed,Inc. <br /> Page 4 <br /> II. DESCRIPTION OF PROPOSED MINING OPERATION (continued) <br /> C. Minine Plan <br /> 1. Operating Plan <br /> Excavation is by the open pit method beginning at the Southeast comer of Phase I, moving in a <br /> Northerly direction, then continuing in a North to South / South to North configuration. This <br /> course of excavation will continue in Phases 11 and III. Excavation depths average ±35'. <br /> Overburden ranges in depth from 0' to t20', with sand and gravel depths averaging from±12' to <br /> f39'. Excavation will commence within 18 months after obtaining a permit and will terminate <br /> with total reclamation within 12 years, dependent upon demand for materials. Excavation occurs <br /> approximately 180 days in a year. Weather conditions and market factors can alter this <br /> approximation. Excavation activity typically occurs between March — October of each year, and <br /> will be limited to a weekly schedule of Monday — Friday, 7:00 a.m. to 4:00 p.m., except during <br /> periods of declared national, state,or county emergency or inclement weather. <br /> Equipment to be used at the project site consists of: <br /> • Scrapers/Dozers to remove overburden <br /> • Backhoe/Excavator to remove sand and gravel <br /> • Trucks (2) to transport materials to the existing processing facility on the South side of <br /> River Road <br /> • Motor Grader and Scraper to level and contour site for final reclamation <br /> • Water Truck to spread water and dust palliatives within project area <br /> 2,3.Topsoil/Overburden <br /> Topsoil / Overburden is stripped, set aside temporarily, then replaced concurrent with excavation. <br /> There will be no stockpiles. <br /> 4. Mine Waste <br /> Sand and Gravel will be processed at the existing processing plant located on the North side of the <br /> Stanislaus River, which operates under Waste Discharge Facility Id No. 513392029001. There will <br /> be no waste discharge associated with the excavation under this permit / reclamation plan. All <br /> excavated materials will either be processed or used for reclamation. <br /> D. Size <br /> 1. Total Acreage to be permitted: f80 <br /> 2. Total acreage to be disturbed: t71 <br /> 3. Total acreage to be reclaimed: ±71 <br /> E. Water Requirements <br /> The only water required for the project is used for dust suppression at the excavation site and haul <br /> roads during the removal and transporting of sand and gravel to the processing plant. If conditions <br /> necessitate watering, it is obtained either from the on-site well or the processing plant. <br />