My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004096
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
27865
>
2600 - Land Use Program
>
PA-0200370
>
SU0004096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:30 AM
Creation date
9/9/2019 9:06:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004096
FACILITY_NAME
PA-0200370
STREET_NUMBER
27865
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
27865 E RIVER RD
RECEIVED_DATE
10/4/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\APPL.PDF \MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\CDD OK.PDF \MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y &CLAMATION PLAN—Bellino Pit <br /> George Reed, Inc. <br /> Page 7 <br /> III. DESCRIPTION OF PROPOSED RECLAMATION (continued) <br /> F. Disposition of Old Equipment <br /> No permanent structures or buildings are involved in this project. All equipment to be used at the <br /> project site is portable and easily removed from the site upon completion of excavation and <br /> reclamation. <br /> G. Reveeetation <br /> An abundance of topsoil is available for reclamation purposes. After excavation activities cease, the <br /> replaced topsoil and roads (or other compacted areas) are ripped and leveled in preparation for <br /> planting. Almond trees are usually planted by hand in the early spring of the year, as weather <br /> conditions allow. Soil amendments, fertilizer, etc., are placed at the discretion of the Farm Contractor <br /> in charge of farming operations. Irrigation water for the existing and future orchard is provided by a <br /> private well. <br /> H. Monitorine and Maintenance <br /> Almond trees require land preparation prior to planting as well as constant maintenance and monitoring <br /> by the Owner and Farm Contractor. To ensure successful planting, the orchard will be maintained by <br /> the Farm Contractor regularly. If a tree failure occurs it will be replanted. Using the services of a <br /> qualified Farm Contractor, the Owner/Operator has successfully reclaimed :320 acres of mined lands <br /> back to almond&walnut orchards. <br /> I. In-Stream Minine <br /> In-stream mining does not apply to this project. <br /> J. Future Minine <br /> This project will deplete existing mineral resources within the project area. It will not preclude future <br /> mining on lands adjacent to or near the project area. <br /> K Public Safety <br /> Truck crossing signs are currently posted on River Road approximately 500 feet east and west of the <br /> entrance to the processing facility. River Road is double-lined from Harrold Avenue to the facility <br /> entrance. Additional measures and/or recommendations can be incorporated if deemed necessary. <br /> L. Other Information <br /> [BLANK] <br /> 08/05/02 JWelch <br />
The URL can be used to link to this page
Your browser does not support the video tag.