My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004096
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
27865
>
2600 - Land Use Program
>
PA-0200370
>
SU0004096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:30 AM
Creation date
9/9/2019 9:06:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004096
FACILITY_NAME
PA-0200370
STREET_NUMBER
27865
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
27865 E RIVER RD
RECEIVED_DATE
10/4/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\APPL.PDF \MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\CDD OK.PDF \MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m. TIME LIMITATION: <br /> 1415.3[p]) The Quarry Excavation Permit shall expire 26 years from the effective date of <br /> approval. (December 31 2029) <br /> Phase 1 e)(GavatiGR shall be GWnpleted by 2007 ?2E, and FeGlaFn90R shall be <br /> Gompleted by 2090 291R. <br /> (2) Phase 11 exGavAtiGR shall hP GOFRpleted by 2009 24'L4, and F9G!aFnat;QR shall be <br /> mpleted by 2011 2!122(3) Phase W exGavatOR shall be GeMpleted by 2013 - <br /> , <br /> and FeGlaFnafieR shall be <br /> .Rpleted by 2015 200 - <br /> /1 <br /> n. ANNUAL INSPECTION REPORTS: Annual inspections of the excavation shall be <br /> conducted by the County to ensure compliance with the conditions of the permit and the <br /> reclamation plan. The County may use professional services as provided for in Section 9- <br /> 240.11. The consultant shall be selected by San Joaquin County. Upon completion of the <br /> annual inspection, the person in charge of the mining operation shall submit to the State <br /> Geologist and the County a report which shall contain all the information as required by <br /> Section 2207 of the Public Resources Code. The cost of the inspection shall be paid by the <br /> mine operator. Additional inspections may be conducted, but the cost of additional <br /> inspections shall be paid for by the mine operator only if non-compliance with the conditions <br /> of the Quarry Excavation Permit or the reclamation plan is found. (Development Title Section <br /> 9-1415.3[q]) <br /> o. PERFORMANCE GUARANTEE: In order to ensure reclamation of the site, compliance <br /> with conditions of approval, and compliance with County and State mining regulations, the <br /> applicant shall provide performance guarantees as a condition of the issuance of the Quarry <br /> Excavation Permit The amount and farm of the guarantee shall be subject to annual review <br /> and approval by the County and the State, and the amount shall be adequate to ensure <br /> reclamation of disturbed land and/or land to be disturbed during a given phase. The annual <br /> review of the financial guarantee shall be coordinated with the annual inspection and <br /> approval of successive reclamation security so that the guarantee includes the amount of <br /> disturbed land plus the amount of land estimated to be disturbed during the next 12 months, <br /> less the amount of land previously determined by the Development Services Division's <br /> annual inspection to have been reclaimed. The performance guarantee shall be in the form <br /> of either(1) a surety bond, (2)a trust fund with the lead agency, or(3)an irrevocable letter of <br /> credit. Any interest accrued in a trust fund shall stay with the trust fund account. The <br /> financial guarantee shall be payable to "San Joaquin County" or the "Department of <br /> Conservation" under the applicable provisions of the County and the State mining <br /> regulations. The financial guarantee shall be callable by the County or the State under the <br /> following circumstances: <br /> (1) The applicant causes the excavation to become idle (as defined in Section 9-110 of the <br /> Development Title)without an approved interim management plan, <br /> (2) The applicant files for bankruptcy; <br /> (3) The County or State determines on the basis of annual inspections and reports that the <br /> applicant has not maintained substantial compliance with the approved Permit, <br /> (4) There arises an occurrence or circumstance which, in the opinion of the County or <br /> State,jeopardizes the site reclamation; or <br /> (5) The State makes one or more of the findings specified in Section 2774.4(a) of the State <br /> Public Resources Code. <br /> (6) In any instance that the County or State makes the demand for partial or full tender of <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.