Laserfiche WebLink
(2) Provide an approved potable water supply for all employees. <br /> (3) Provide approved toilets for all employees (chemical toilets are acceptable). <br /> (4) Provide hand-washing facilities on or near the approved toilets. (Development Title <br /> Section 9-1415.3[i]) <br /> SETBACKS: No excavation shall take place within twenty-five (25) feet of any property line <br /> or right-of-way (nor within the allowed slopes adjacent to said twenty-five (25)foot setback), <br /> unless the elevation prior to excavation is more than that of the abutting property, in which <br /> case the elevation within said twenty-five (25) foot setback shall at no time be less than that <br /> of the abutting property, at the property line. (Development Title Section 9-1415.303) <br /> (1) Temporary Cut Slopes at Setback Lines. Temporary cut slopes (i.e., for limited periods <br /> of time, slopes that are in the process of extraction prior to being backfilled) at setback <br /> lines shall not exceed one (1) foot horizontal to one (1) foot vertical, except that <br /> temporary cut slopes at setback lines to a maximum of one half(1/2) of a foot horizontal <br /> to one (1) foot vertical may be maintained if site-specific geologic and engineering <br /> analysis demonstrate through a slope stability analysis that the proposed temporary cut <br /> slopes will have a minimum slope stability factor of safety as required in Section 9- <br /> 1415.3(k)(4). However, in the event that there are existing structures on the adjacent <br /> property (or the immediate potential for structures on the adjacent property), the <br /> excavation shall at no time be closer to the property line than a line projected on a slope <br /> of one(1)to one (1)from the property line to the toe of slope. <br /> (2) Final Slopes. Final cut and/or fill slopes shall not exceed two (2) feet horizontal to one <br /> (1)foot vertical. <br /> (3) Fill Slopes. Fill slopes shall be constructed consistent with recommendations from a <br /> qualified civil/geotechnical engineer based upon site-specific geologic conditions, <br /> j. FENCING: Fencing four (4) feet in height consisting of not less than three (3) strands of <br /> barbed wire, or an approved equivalent, shall be placed around the excavation area where <br /> slopes steeper than two(2) feet horizontal to one(1) foot vertical are maintained. Six (6)foot <br /> high security fencing or an approved equivalent shall be required where slopes steeper than <br /> two (2) feet horizontal to one (1) foot vertical are created, if the proximity of such slopes to <br /> residential uses or other uses involving a concentration of people so warrants. (Development <br /> Title Section 9-1415.3[11) <br /> k, SCREENING AND LANDSCAPING: Screening consistent with Chapter 9-1020 is required. <br /> (Development Title Section 9-1415.3[m]) <br /> (1) The landscaped area shall be ten (10) feet wide. Adequate setback for maintenance <br /> shall be required, and sight distance at road intersections shall not be impaired. A row <br /> of crop trees satisfies this requirement. <br /> I. EXCAVATION/RECLAMATION SCHEDULE: The reclamation plan shall show the phases <br /> of excavation. Reclamation on one phase of an excavation shall be initiated prior to the start <br /> of the next excavation phase. The final reclamation of any phase of excavation shall be <br /> completed within two years of the commencement of the reclamation process. Excavation <br /> shall be limited so that at any point of time a maximum of one phase is being reclaimed <br /> while one phase is being excavated. (Development Title Section 9-1415.3[0]) <br /> 3 <br />