My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007882
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2600 - Land Use Program
>
PA-0900184
>
SU0007882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2023 4:26:04 PM
Creation date
9/9/2019 9:09:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007882
PE
2627
FACILITY_NAME
PA-0900184
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
APN
19802004 07
ENTERED_DATE
8/25/2009 12:00:00 AM
SITE_LOCATION
1000 E ROTH RD
RECEIVED_DATE
8/24/2009 12:00:00 AM
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\APPL.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\CDD OK.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH COND.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.2 ENVIRONMENTAL EFFECTS THAT ARE CONSIDERED SIGNIFICANT AND <br /> UNAVOIDABLE IMPACTS <br /> This section identifies the significant and unavoidable impacts that require a Statement of Overriding <br /> Considerations to be issued by the County,pursuant to Section 15093 of the CEQA Guidelines,if the project <br /> is approved. Based on the analysis contained in the EIR, the following impacts would be significant and <br /> unavoidable: <br /> • Traffic <br /> o Existing Plus Project Conditions <br /> • Increase average vehicle delay at two unsignalized intersections already operating at <br /> an unacceptable level of service C'LOS'S by more than threshold of significance <br /> • Degrade the LOS at one =signalized intersection from an acceptable to an <br /> unacceptable LOS <br /> • Degrade the level of service at one freeway off-ramp (diverge) from an acceptable to <br /> an unacceptable LOS <br /> o Year 2013 Plus Project(Phase I) Conditions <br /> • Increase traffic volumes at three freeway ramps by more than threshold of <br /> significance <br /> o Year 2021 Plus Project(Phases I&II) Conditions <br /> • Increase average vehicle delay at two unsignalized intersections already operating at <br /> an unacceptable LOS by more than threshold of significance <br /> • Degrade the LOS at one unsignalized intersection from an acceptable to an <br /> unacceptable LOS and increase the average vehicle delay by more than threshold of <br /> significance `J <br /> • Increase average vehicle delay at three unsignalized intersections already operating at <br /> an unacceptable LOS by more than threshold of significance <br /> o Year 2035 Plus Project(Phases I& II) Conditions <br /> • Increase average vehicle delay at two signalized intersections already operating at an <br /> unacceptable LOS by more than threshold of significance <br /> • Increase average vehicle delay at five unsignalized intersections already operating at <br /> an unacceptable LOS by more than threshold of significance <br /> • Degrade the LOS at one unsignalized intersection from an acceptable to an <br /> unacceptable LOS and increase the average vehicle delay by more than threshold of <br /> significance <br /> • Increase average vehicle delay at one unsignalized intersections by more than <br /> threshold of significance <br /> • Degrade the LOS at one signalized intersection from an acceptable to an <br /> unacceptable LOS. <br /> • Add more than 100 trips to six freeway segments already operating at an <br /> unacceptable LOS <br /> • Add more than one percent traffic to four freeway ramps already operating at an <br /> unacceptable LOS <br /> • Increase traffic volumes at five freeway ramps by more than one percent threshold <br /> of significance <br /> • Cause eastbound vehicles stopped at the Roth Road eastern Oakland Subdivision at- <br /> grade rail crossing to queue as far back as the I-5 interchange at Roth Road, a <br /> condition which would also exist under the 2035 No-Project Conditions, <br /> November 2012 15 Findings of Fact/ <br /> Statement of Overriding Considerations <br />
The URL can be used to link to this page
Your browser does not support the video tag.