Laserfiche WebLink
Responsible <br /> Significant <br /> Measures and Statements of Findings of impacts Being Monitoring/ Monitoring/Reporting <br /> g <br /> Significant and Unavoidable Reporting Action Party for Providing Responsibility Timing <br /> Mitigation <br /> ultimately widened to ten lanes(five in each direction Including one HOV lane). <br /> Widening the segment by one mixed-flow lane and one HOV lane(consistent <br /> with the Interstate 5 TCR)would Improve the service level,but only to an <br /> unacceptable LOS E.This Impact Is therefore significant and unavoidable. <br /> TRANS-27:There Is no feasible measure to mitigate the Impact to a less-than- N/A N/A N/A N/A <br /> significant level.Addition of two mixed-Flow lanes to the southbound 1-5 freeway <br /> segment between Roth Road and Lathrop Road would be required to mitigate <br /> the Impact to a less-than-significant level,but that would be Inconsistent with <br /> Caltrans'Interstate 5 TCR,which Identifies this section of the freeway to be <br /> ultimately widened to ten lanes(five in each direction Including one HOV lane). . <br /> Widening the segment by one mixed-flow lane and one HOV lane(consistent <br /> with the Interstate 5 TCR)would Improve the service level,but only to an <br /> unacceptable LOS E.This Impact is therefore significant and unavoidable. <br /> TRANS-28:Prior to the Issuance of building permits for Phase II of the project, Verification by County. Union Pacific San Joaquin County- Prior to Issuance of building <br /> the project sponsor shall Implement Mitigation Measure TRANS-24(contribute Community Development permits for Phase II <br /> fair share of the cost of adding a lane to the northbound 1-5 freeway segment Department and Public <br /> between Lathrop Road and Roth Road,which improvement is programmed for Works Department <br /> Inclusion and construction under the RTIF program and is consistent with <br /> Caltrans'Interstate 5 TCR)by paying the applicable fees for the project under <br /> the RTIF program at the time of building permit applications.Construction of <br /> the improvement described in Mitigation Measure TRANS-24 would Improve <br /> merge operation LOS to an acceptable LOS D.Because San Joaquin County, <br /> as Lead Agency,does not have jurisdiction over this improvement and it is <br /> uncertain whether full funding will be achieved for construction of this <br /> Improvement,this impact is significant and unavoidable. <br /> TRANS-29:Prior to the issuance of building permits for Phase II of the project, Verification by County. Union Pacific San Joaquin County Prior to issuance of building <br /> the project sponsor shall contribute its fair share of the cost of adding a lane to Community Development permits for Phase II <br /> the southbound 1-5 freeway segment between Mathews Road and Roth Road, Department and Public <br /> which Improvement Is programmed for inclusion and construction under the Works Department <br /> RTIF program and is consistent with Caltrans'Interstate 5 TCR,by paying the <br /> applicable fees for the project under the RTIF program at the time of building <br /> permit applications.Construction of this improvement would Improve merge <br /> operation LOS to an acceptable LOS D.Because San Joaquin County,as <br /> 4.2 Transportation and Traffic(cont) <br /> Lead Agency,does not have jurisdiction over this Improvement and it is <br /> uncertain whether full funding will be achieved for construction of this <br /> Improvement,this impact is significant and unavoidable. <br /> TRANS-30:There Is no feasible measure to mitigate the Impact to a less-than- N/A N/A N/A N/A <br /> slgnlficant level.As described above,adding one additional mixed-flow lane and <br /> an HOV lane to the freeway segment would Improve the service level to LOS E <br /> (remaining unacceptable).To fully mitigate the Impact,a second additional <br /> mixed-flow lane would be re ulred,which Is beyond what has been identified in <br />