5 <br /> ATTACHMENT 1 <br /> PROJECT DESCRIPTION <br /> EXISTING OPERATIONS <br /> The existing intermodal facility covers approximately 122.91 acres and can handle 206,000 <br /> "lifts," defined as the loading.or unloading of a cargo unit, either truck trailers (with wheels) or <br /> containers (without wheels) to or from a rail car, per year. The existing facility uses 3 <br /> unloading/loading tracks totaling 15,1422 feet and 1 support track totaling 6,193 feet. Inbound <br /> and outbound cargo units are loaded and unloaded to rail cars by 4 rubber tire gantry cranes, with <br /> one overhead"packer"to conduct the transfer operation. <br /> Currently, the facility has 1,8003 on-site parking locations (1,450 11 x 53 feet and 350 11 x 60 <br /> feet) for cargo units, or"bays," and 57 parking spots for employees and guests (passenger cars), <br /> with no on-street parking. All inbound and outbound cargo units are carried by trucks, which are <br /> processed through 9 manually-operated gate lanes. The existing operation includes an <br /> administrative office building, two detention ponds for stormwater management, a septic system <br /> for wastewater management, a crane service pad, a truck fueling pad, and a maintenance shop <br /> building. <br /> THE EXPANSION PROJECT <br /> The expansion will add approximately 81.2 acres to the facility. At full build-out, the expanded <br /> facility will have the capacity to handle 407,000 lifts per year. One of the existing <br /> unloading/loading tracks will be converted to a support track 6,107 feet in length. New <br /> construction will include 3 new unloading/loading tracks totaling 14,443 feet and 3 new support <br /> tracks totaling 15,482 feet, 2 new engine ready tracks totaling 1,311 feet, and the addition of <br /> 1,366 (net)new bays for cargo units for a total of 3,166 bays (415 11 x 53 feet and 2,75111 x 60 <br /> feet). A 10-lane Automated Gate System (AGS) will replace the existing manual gates. A <br /> second administration building and 2 new crane servicing pads will also be added, along with 3 <br /> new detention ponds, a new septic system to service the new administration building, a new <br /> concrete access road and 47 new parking spaces for employees and guests. <br /> The applicant seeks approval of the incremental expansion detailed in the second column of the <br /> chart below, marked "Additions." This incremental expansion is the"Project". <br /> 10.9 acres are proposed to be added to the facility for the temporary parking of cargo units in addition to <br /> the existing 112,0 acre footprint of the facility for a total of 122.9 acres. This additional parking is being proposed <br /> pursuant to a separate,pending Use Permit filed with the County on July 24,2009(the"Temporary Parking CUP"). <br /> 2 All existing and proposed track lengths mentioned hereafter refer to track"working lengths." The <br /> working length consists of the portion of track on which rail cars.will be stored temporarily during cargo transfer <br /> operations.This length does not include lead tracks or turnouts. <br /> 3 350 11 x 60 bays are proposed to be added pursuant to the Temporary Parking CUP in addition to 1450 11 x 53 <br /> existing bays for a total of 1,800 bays. <br /> 1 <br /> ! #38852 v9 ATTACHMENT 1 <br />