My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007882
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2600 - Land Use Program
>
PA-0900184
>
SU0007882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2023 4:26:04 PM
Creation date
9/9/2019 9:09:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007882
PE
2627
FACILITY_NAME
PA-0900184
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
APN
19802004 07
ENTERED_DATE
8/25/2009 12:00:00 AM
SITE_LOCATION
1000 E ROTH RD
RECEIVED_DATE
8/24/2009 12:00:00 AM
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\APPL.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\CDD OK.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH COND.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The expansion project and related work will be phased as follows: <br /> Phase 1 -2011 <br /> • Construct 2 unloading/loading track(10,1 50feet). <br /> • Construct2engine ready tracks (1,311 feet). <br /> • Convert existing unloading/loading track to support track (6,107 feet). <br /> • Construct 3 support tracks (15,482 feet). <br /> • Construct 10 lane AGS Gate and relocate facility entrance. <br /> • Construct/relocate 1,885 parking bays to provide a total of 2,300 parking bays. <br /> • Construct lighting/fencin > e c associated with parking bays. <br /> i7 nstruct new dministration buildin 47 parking spaces and related septic system <br /> • Construct 2 new cr n ads <br /> • Construct 3 new detention ponds <br /> • Construct new concrete access road <br /> Phase 2 -2016 (estimated) <br /> • Construct additional unloading/loading track(4,293 feet). <br /> • Construct 866 parking bays. <br /> Additional details regarding the existing intermodal operations and proposed expansion project <br /> are summarized in the chart and Site Pian below. <br /> The applicant also plans to add track to the facility in two areas pursuant to its authority as a <br /> railroad corporation and as depicted on the attached Site Plan: (1) an additional storage track <br /> totaling approximately 6,193 feet at the western edge of the site to constructed in 2010, and (2) <br /> approximately 5,614 feet of switching lead track adjacent to the maim line and north of the Roth <br /> Road intersection/crossing to be constructed in 2011. Neither of these additions are part of the <br /> current project for which a Use Permit is being sought. . <br /> i <br /> i 2 <br /> #38852 v1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.