Laserfiche WebLink
EXISTING FACILITY AND OPERATIONS ADDITIONS(THE "PROJECT") TOTAL <br /> Area 122.9 acres 81.2 acres 204.1 acres <br /> Parking Bays(Cargo Units)* 1,800 1,366(net) <br /> 3,166 <br /> Unload!ng/Loadi n g Tracks(double 14,645 ft 8,336 ft(net)(6,107 ft of existing 22,981ft <br /> stack) unloading/loading track converted to <br /> support track; 14,443ft of new <br /> unloadinglloading track) <br /> Support Tracks 6,193 - 21,589 ft(includes 6,107 ft of existing 27,782 ft <br /> unload inglloading track converted to <br /> support track) <br /> Engine Ready Track 0 1,311 ft 1,311 ft <br /> Lifts 206,000(2007) 201,000 407,000(at peak) (- <br /> Employees 90 68 158 <br /> Truck Trips(with cargo units and 615 per day Mon-Fri(0400—1600) 460 per day Mon-Fri(0400-1600) 1075 per day Mon-Fri(0400-1600) <br /> excluding Bobtails,i.e.,trucks 203 per day Mon.-Fri(1600-0400) 152 per day Mon-Fri(1600-0400) 355 per day Mon-Fri(1600-0400) <br /> without cargo units attached) 47 per day Sat-Sun(0400-1600) 35 per day Sat-Sun(0400-1600) 82 per day Sat-Sun (0400- 1600) <br /> 24 per day Sat-Sun(1600-0400) 18 per day Sat-Sun(1600-0400) 42 per day Sat-Sun(1600-0400) <br /> Passenger Vehicles Trips Per Day 190 143 333 <br /> (Employees and Guests) <br /> Passenger Vehicle.Parking 57 47 104 <br /> Gate Operations 9 Manual Gate Lanes 10-AGS Lanes(5 inbound,5 outbound, 10 AGS Lanes(5 inbound, 5 outbound <br /> including Bobtail); replaces 9 Manual including Bobtail) <br /> Crane Servicing Pad 1 '2(60 x 60 feet) 3 <br /> Truck Fueling Pad 1 0 1 <br /> Hostlers 16 20 36 <br /> Gantry Cranes 4 1 5 l <br /> Detention Ponds 2 3 5 <br /> Maintenance Buildings 1 0 1 <br /> Septic 1 1 2 <br /> Heister Forklifts 1 0 1 <br /> Packers 2 0 2 <br /> Office Building 3520 sq ft 3447 sq ft 6967 sq ft <br /> *Net parking bays calculated as follows:Currently 1,450 parking bays exist. 350 additional spaces to be constructed in 2009 per pending C.U.P. application,to provide a total of 1,800 <br /> bays. 1,385 of those bays will be relocated within the yard during construction,415 will remain in their current location,and 1,366 additional bays will be constructed. <br /> 3 <br /> #38852 v8 ATTACHMENT t <br />