My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007882
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2600 - Land Use Program
>
PA-0900184
>
SU0007882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2023 4:26:04 PM
Creation date
9/9/2019 9:09:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007882
PE
2627
FACILITY_NAME
PA-0900184
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
APN
19802004 07
ENTERED_DATE
8/25/2009 12:00:00 AM
SITE_LOCATION
1000 E ROTH RD
RECEIVED_DATE
8/24/2009 12:00:00 AM
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\APPL.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\CDD OK.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH COND.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXISTING FACILITY AND OPERATIONS ADDITIONS(THE "PROJECT") TOTAL <br /> Area 122.9 acres 81.2 acres 204.1 acres <br /> Parking Bays(Cargo Units)* 1,800 1,366(net) <br /> 3,166 <br /> Unload!ng/Loadi n g Tracks(double 14,645 ft 8,336 ft(net)(6,107 ft of existing 22,981ft <br /> stack) unloading/loading track converted to <br /> support track; 14,443ft of new <br /> unloadinglloading track) <br /> Support Tracks 6,193 - 21,589 ft(includes 6,107 ft of existing 27,782 ft <br /> unload inglloading track converted to <br /> support track) <br /> Engine Ready Track 0 1,311 ft 1,311 ft <br /> Lifts 206,000(2007) 201,000 407,000(at peak) (- <br /> Employees 90 68 158 <br /> Truck Trips(with cargo units and 615 per day Mon-Fri(0400—1600) 460 per day Mon-Fri(0400-1600) 1075 per day Mon-Fri(0400-1600) <br /> excluding Bobtails,i.e.,trucks 203 per day Mon.-Fri(1600-0400) 152 per day Mon-Fri(1600-0400) 355 per day Mon-Fri(1600-0400) <br /> without cargo units attached) 47 per day Sat-Sun(0400-1600) 35 per day Sat-Sun(0400-1600) 82 per day Sat-Sun (0400- 1600) <br /> 24 per day Sat-Sun(1600-0400) 18 per day Sat-Sun(1600-0400) 42 per day Sat-Sun(1600-0400) <br /> Passenger Vehicles Trips Per Day 190 143 333 <br /> (Employees and Guests) <br /> Passenger Vehicle.Parking 57 47 104 <br /> Gate Operations 9 Manual Gate Lanes 10-AGS Lanes(5 inbound,5 outbound, 10 AGS Lanes(5 inbound, 5 outbound <br /> including Bobtail); replaces 9 Manual including Bobtail) <br /> Crane Servicing Pad 1 '2(60 x 60 feet) 3 <br /> Truck Fueling Pad 1 0 1 <br /> Hostlers 16 20 36 <br /> Gantry Cranes 4 1 5 l <br /> Detention Ponds 2 3 5 <br /> Maintenance Buildings 1 0 1 <br /> Septic 1 1 2 <br /> Heister Forklifts 1 0 1 <br /> Packers 2 0 2 <br /> Office Building 3520 sq ft 3447 sq ft 6967 sq ft <br /> *Net parking bays calculated as follows:Currently 1,450 parking bays exist. 350 additional spaces to be constructed in 2009 per pending C.U.P. application,to provide a total of 1,800 <br /> bays. 1,385 of those bays will be relocated within the yard during construction,415 will remain in their current location,and 1,366 additional bays will be constructed. <br /> 3 <br /> #38852 v8 ATTACHMENT t <br />
The URL can be used to link to this page
Your browser does not support the video tag.