My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007882
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2600 - Land Use Program
>
PA-0900184
>
SU0007882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2023 4:26:04 PM
Creation date
9/9/2019 9:09:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007882
PE
2627
FACILITY_NAME
PA-0900184
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
APN
19802004 07
ENTERED_DATE
8/25/2009 12:00:00 AM
SITE_LOCATION
1000 E ROTH RD
RECEIVED_DATE
8/24/2009 12:00:00 AM
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\APPL.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\CDD OK.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH COND.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m. Prior to issuance of any building permits for phase 2, applicant shall pay the project's fair <br /> share cost for the following traffic mitigations at the intersection of Airport Way and French <br /> Camp Road by paying the applicable fees for the project under the TIMF program at the time <br /> of payment: <br /> 1. Additional left turn lane on the southbound Airport Way approach. <br /> 2. Additional left turn lane on the westbound French Camp Road approach. <br /> n. Prior to issuance of any building permits for phase 2, applicant shall pay the project's fair <br /> share cost for the following traffic mitigations at the intersection of Airport Way and <br /> Daisywood Drive: <br /> 1. Installation of a separate left turn lane and a shared through/right turn lane on the <br /> eastbound and westbound Daisywood Drive approaches. <br /> 2. Installation of a second southbound through lane. <br /> Fair share payments for mitigations that are included in the RTIF program at the time of <br /> payment shall be credited against the required RTIF fee. <br /> o. Prior to issuance of any building permits for phase 2, applicant shall pay the project's fair <br /> share cost for the following traffic mitigations at the intersection of Lathrop Road and 1-5 <br /> southbound ramps by paying the applicable fees for the project under the RTIF program at <br /> the time of payment: <br /> 1. Conversion of the eastbound approach from shared through/right turn lane to three <br /> separate through lanes and two free right turn lanes. <br /> 2. Construction of one additional left turn lane and two additional through lanes on the <br /> westbound approach. <br /> 3. Conversion of the shared left turn/through/right turn lane on the southbound approach to <br /> two left tum lanes, separate through lane and a free right turn lane. <br /> p. Prior to issuance of any building permits for phase 2, applicant shall pay the project's fair <br /> share cost for the following traffic mitigations at the intersection of Lathrop Road and 1-5 <br /> northbound ramps by paying the applicable fees for the project under the RTIF program at <br /> the time of payment: <br /> 1. Installation of an additional left turn lane on the eastbound approach. <br /> 2. Conversion of the existing westbound approach from shared through/right turn lane to <br /> three separate through lanes and a separate free right turn lane. <br /> 3. Conversion of the existing shared northbound approach to two left turn lanes, one <br /> through lane and one free right turn lane <br /> q. Prior to issuance of any building permits for phase 2, applicant shall pay the project's fair <br /> share cost for the following traffic mitigations at the intersection of Airport Way and Lathrop <br /> Road: <br /> 1. Installation of an additional through lane on the northbound approach. <br /> 2. Installation of an additional left turn lane and conversion of the separate right turn lane to <br /> a shared through/right turn lane on the southbound approach. <br /> 3. Conversion of the eastbound approach from separate left, through and right turn lanes to <br /> two left turn lanes, two through lanes and one right turn lane. <br /> 4. Conversion of the westbound approach from a separate left turn lane and a shared <br /> through/right turn lane to one left turn lane, two through lanes and one right turn lane. <br /> Fair share payments for mitigations that are included in the RTIF program at the time of <br /> payment shall be credited against the required RTIF fee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.