Laserfiche WebLink
'Qp44�M O <br /> THOMAS M. GAU .' '✓ fel P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> DIRECTOR ?'(�J" SYOCH-300 CALIFORNIA 95201 <br /> -29 <br /> „y ` (209)468-3000 FAX(209)468-2999 <br /> < co'aM` /L11y h� w Sjgov.org/pubworks <br /> FRITZ BUCHMAN <br /> DEPUTY DIRECTOR <br /> MICHAEL SELLING `�>nYj�Cll!.�13 '_�Sx you <br /> DEPUTY DIRECTOR <br /> ROGER JANES <br /> BUSINESS ADMINISTRATOR <br /> November 1,2012 <br /> MEMORANDUM <br /> TO: John L.Funderburg,Principal Planner <br /> Community Development Department <br /> CONTACT PERSON: Mo Hatef <br /> FROM: Alex Chetley,Engineering Services Manager <br /> Development Services Division (o <br /> SUBJECT: PA-0900184;A Use Permit application to expand an existing intermodal facility in two(2)phases to <br /> be completed in ten years. The expansion area which is east and south of the existing intermodal facility <br /> encompasses 146 acres and includes the following improvements:Phase 1 -lengthen three existing <br /> working tracks by 7,303 feet; add 1,906 feet of engine-ready tracks;construct three new support tracks <br /> totaling 23,905 feet; add 6 container bays and 61 employee parking spaces; demolish the existing gate and <br /> maintenance building; construct the following: 7,140 square-foot gate building, 14,010 square-foot <br /> maintenance building,352 square-foot driver kiosk,two 1,080 square-foot portal buildings,280 square- <br /> foot crew shanty, 100 square-foot IWTP(Industrial Wastewater Treatment Plant)building,2000 square <br /> foot Mechanical Forces Building, 1,500 square foot IWTP Sludge Container Canopy,Two 3,360 square <br /> foot Truck Canopies,6,270 square foot Inspection Pit Canopy, 9,400 square foot Roadability Canopy,200 <br /> square foot Passenger Shelter Canopy;replace the existing 120-foot-high communications tower with a <br /> 140-foot-high communications tower;add a ten-lane automated gate system;relocate the existing entrance <br /> further east on Roth Road and provide alternate entrance for employees on Lathrop Road,and construct <br /> two crane maintenance pads.Phase 2-construct two additional working tracks totaling 13,678 feet; <br /> construct two additional support tracks totaling 14,633 feet;add 1,895 container bays and 28 employee <br /> parking spaces,and construct two additional crane maintenance pads; located on the south side of Roth <br /> Road and the north side of Lathrop Road, 1,840 feet west of Airport Way in French Camp. (Supervisorial <br /> District 3) /o ao Ary RA. <br /> PROPERTY OWNER: E&E Murphy Family LP Eta] APPLICANT: Union Pacific Railroad Company <br /> Union Pacific Railroad Company <br /> ADDRESS: 1000 E.Roth Road,French Camp APN: 198-030-20,23,29,31; <br /> 198-200-01,05, 16 <br /> 198-050-27,28 <br />