My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0010231
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2600 - Land Use Program
>
PA-0900184
>
SU0010231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2024 4:16:32 PM
Creation date
9/9/2019 9:09:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0010231
PE
2656
FACILITY_NAME
PA-0900184
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-
ENTERED_DATE
9/19/2014 12:00:00 AM
SITE_LOCATION
1000 E ROTH RD
RECEIVED_DATE
12/21/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\APPL.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\CDD OK.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
adjusted July 1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record. (Resolutions R-00-433) <br /> g. The Regional Transportation Impact Fee shall be required for this development. The fee is <br /> due and payable at the time of building permit application for each phase of the project. The <br /> fee will be based on the current schedule at the time of payment. (Resolution R-06-38) <br /> h. Prior to issuance of any building permits for phase 1, applicant shall pay the project's fair <br /> share cost for the following traffic mitigation by paying the applicable fees for the project <br /> under the RTIF program at the time of payment: <br /> 1. Installation of a traffic signal at the intersection of Lathrop Road and 1-5 southbound <br /> ramps. <br /> i. Prior to issuance of any building permits for phase 1, applicant shall pay the project's fair <br /> share cost for the following traffic mitigation by paying the applicable fees for the project <br /> under the RTIF program at the time of payment: <br /> 1. Installation of a traffic signal at the intersection of Lathrop Road and 1-5 northbound <br /> ramps. <br /> j. Prior to issuance of any building permits for phase 1, applicant shall pay the project's fair <br /> share cost for the following traffic mitigation by paying the applicable fees for the project <br /> under the RTIF program at the time of payment: <br /> 1. Addition of a lane to the southbound State Route 99 freeway segment between French <br /> Camp Road and Lathrop Road. <br /> k. Prior to issuance of any building permits for phase 2, applicant shall pay the project's fair <br /> share traffic mitigations for site specific traffic impacts as follows- <br /> 1. <br /> ollows:1. 6.1%of the cost to install a traffic signal at the intersection of Roth Road and 1-5 <br /> southbound ramps and the following improvements at that intersection: <br /> (1) Conversion of the southbound approach from a left and shared left/through/right turn <br /> lane to a separate left turn lane and a shared right turn/through lane. <br /> (2) Installation of an additional left turn lane on the westbound approach. <br /> 2. 9.8% of the cost to install a traffic signal at the intersection of Roth Road and 1-5 <br /> northbound ramps. <br /> 3. 12.2%of the cost to install a traffic signal at the intersection of Harlan Road and Roth <br /> Road including and the following improvements at that intersection: <br /> (1) Conversion of the northbound Harlan Road approach from the existing shared left- <br /> turn/through lane and separate right-turn lane to a separate left-turn lane and shared <br /> through/right-turn lane. <br /> (2) Conversion of westbound and southbound approaches from shared left- <br /> turn/through/right-tum lane to separate left-turn lane and a shared through/right turn <br /> lane. <br /> Fair share payments for mitigations that are included in the RTIF program at the time of <br /> payment shall be credited.against the required RTIF fee. <br /> I. Prior to issuance of any building permits for phase 1, applicant shall pay the project's fair <br /> share cost for the following traffic mitigation by paying the applicable fees for the project <br /> under the RTIF program at the time of payment: <br /> 1_ Installation of a traffic signal at the intersection of French Camp Road and State Route 99 <br /> southbound ramps. <br />
The URL can be used to link to this page
Your browser does not support the video tag.