My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0010231
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2600 - Land Use Program
>
PA-0900184
>
SU0010231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2024 4:16:32 PM
Creation date
9/9/2019 9:09:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0010231
PE
2656
FACILITY_NAME
PA-0900184
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-
ENTERED_DATE
9/19/2014 12:00:00 AM
SITE_LOCATION
1000 E ROTH RD
RECEIVED_DATE
12/21/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\APPL.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\CDD OK.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
concrete pipe and shall be relocated, if necessary, to District approved locations. <br /> Facilities determined to be affected by this development include Lateral "Rj", "Rg", "T', <br /> and "Rgc". Additionally, improvements to the FCOC and Drain 3 will be necessitated by <br /> this project. <br /> c. Further, hydraulic calculations to determine pipe size will be required for any design <br /> changes or relocations that are proposed on District facilities. In accordance with District <br /> standards, construction on District facilities is not allowed between February 15th and <br /> October 15th of any given year. As such, plans for pipeline improvements need to be <br /> received no later than mid-July(3 months before the end of water season), so that all <br /> construction work can be completed during the provided window period. <br /> d. All improvements to the District facilities shall comply with the District's current standards, <br /> drawings, and policies. The developer shall enter into the necessary agreements, <br /> permits, etc., required by the District for construction of District facilities. <br /> e. District facilities within the development, or impacted by the development, which provide <br /> storm water drainage or irrigation spill functions, shall not be abandoned, relocated, or <br /> replaced, unless alternate provisions are made to handle such drainage in accordance <br /> with District approval. <br /> f. The property owner and/or developer shall execute Irrigation Service Abandonment <br /> Agreements and provide for the removal of irrigation and drainage facilities and <br /> structures on property no longer requiring irrigation service. The method of abandonment <br /> and extent of such removal shall be determined by the District. <br /> g. Private irrigation facilities and easements shall be provided for private use to <br /> accommodate property that will still be using District water to irrigate adjacent to the <br /> development. The proposed connection of any such private facility to District facilities <br /> shall be approved in advance by the District. <br /> h. Easements for all District facilities shall be dedicated on current District forms. Additional <br /> easements shall be dedicated for access to all manholes and control structures. All <br /> District easements shall be shown on the final map together with the District's standard <br /> acknowledgment. Easements for pipelines shall be a minimum of 30 ft. in width. A title <br /> report shall be provided to the District for its use in the preparation of all required <br /> documents to ascertain if the District has a fee interest with the proposed development. <br /> Based on our review,the District does have fee interest in portions of the FCOC and <br /> Drain 3. As such, the developer will not be able to include the property as part of the <br /> development unless they obtain approval in accordance with District policy. <br /> i. Improvement plans for both off-site and on-site improvements shall be submitted for <br /> review and approval by the District's Board of Directors. Prior to plan submittal, the <br /> developer shall submit a retainer for plan check and inspections required for the project in <br /> accordance with the current established fee schedule. <br /> j. Upon completion of the project, the developer shall provide one complete set of"As-Built" <br /> drawings to the District for its future use. <br /> k. The following statement shall be affixed or otherwise included within the approved <br /> development plans: "SSJID has adopted time limits limiting the period of its approval <br /> should the landowner/developer fail to substantially complete his development project in <br /> a timely manner and as per approved development plans. <br /> I. These time limits adopted by SSJID are in most cases equal to those utilized by the <br /> governmental agency or institution responsible for development approvals. Should the <br />
The URL can be used to link to this page
Your browser does not support the video tag.