Laserfiche WebLink
- i <br /> Mitigation Measures and Statements of Findings of Impacts Being Monitoring/ Responsible Party for Providing Monitoring/Reporting Timing <br /> and Unavoidable Reporting Action Mitigation Responsibility <br /> control fugitive dust emissions using sufficient water or chemical <br /> stabilizer/suppressant. <br /> AIR-1 h:Trackout shall be immediately removed when it extends 50 or more <br /> feet from the site and at the end of each workday. <br /> AIR-1 is Any site with 150 or more vehicle trips per day shall prevent carryout <br /> and trackout. <br /> AIR-11:Traffic speeds on unpaved roads shall be limited to 15 miles per hour. <br /> AIR-1 k:Sandbags or other erosion control measures shall be installed to <br /> prevent silt runoff to public roadways from sites with a slope greater than <br /> one percent. <br /> 4.3 Air QUa::1 and Greenhouii.:Gases(cont F t. �� ' <br /> AIR-11:Areas subject to excavation,grading,and other construction activity at <br /> any one time shall be limited. <br /> AIR-1m:idling time shall be minimized for construction equipment(e.g.,five- <br /> minute maximum). <br /> Less than significant impact after implementation of Mitigation Measures <br /> AIR-1a through AIR-1m. <br /> AIR-2a;All facility switch locomotives shall meet Tier 0 Plus emission levels by Verification by County. Union Pacific Union Pacific,with During project operations <br /> 2021, verification provided to San <br /> Joaquin County Community <br /> AIR-2b;The facility shall implement an anti-idling policy at the facility that Development Department <br /> generally limits non-necessary idling of cargo-handling equipment to five <br /> minutes or less.The policy shall include those exceptions that are determined <br /> to be necessary by the applicant for safe and efficient railroad operations, <br /> including,but not limited to,as necessary to ensure the safe operation of the <br /> equipment or to protect the safety of any person,as necessary during adverse <br /> weather,as necessary for equipment testing,and as necessary to power a <br /> heater or air conditioner or ancillary equipment. j <br /> AIR-2c;The facility shall install an automatic gate system(AGS). l <br /> i <br /> AIR-2d; One hundred percent of Direct-to-Locomotive(DTL)refueling <br /> performed at the facility shall be with diesel fuel meeting CARB's specification <br /> for on-highway diesel(i.e.,with CARB diesel). <br /> AIR-2e:The facility shall install electrical infrastructure(i.e."a reefer rack"to <br /> support the operation of one hundred percent of the expected container TROs <br /> on electrical power while being stored at the facility. I <br /> Less than significant impact after implementation of Mitigation Measures <br /> AIR-2a through AIR-2e. <br />