Responsible Mitigation Measures and Statements of Findings of Impacts Being Monitoring/ RespMonitoring/Reporting
<br /> Significant and Unavoidable Reporting Action Party for Providing Responsibility Timing
<br /> Mitigation
<br /> NOISE-1a through NOISE-1d.
<br /> 4.5 Aesthetics 'r
<br /> i
<br /> AESTHETICS-1:All lighting shat(be effectively shielded to prevent spillage County staff to review within Union Pacific San Joaquin County Prior to issuance of building
<br /> beyond the area requiring lighting for safety and operational purposes.No lighting 30 days of lighting Community Development permits for Phase I
<br /> shall be directed off the site or placed directionally so that lighting would shine installation Department
<br /> outwards during project operations.Specifications for lighting shall be provided
<br /> for County staff review at the time of the first building permit issued for Phase I
<br /> construction.County staff shall complete a site review within 30 days of lighting
<br /> Installation to ensure that no excess spillage of light occurs off the site and that
<br /> any off-site lighting at nearby parcels is less than one-half foot candle at the most.
<br /> Less than significant Impact after implementation of Mitigation Measure
<br /> AESTHETICS-1.
<br /> AESTHETICS-2:The project applicant shall implement Mitigation Measure County staff to review within Union Pacific San Joaquin County Prior to issuance of building
<br /> AESTHETICS-1. 30 days of lighting Community Development permits for Phase
<br /> Less than significant impact after implementation of Mitigation Measure
<br /> installation Department
<br /> AESTHETICS-1.
<br /> 4.6 Biological Resources
<br /> 610-1a:Swainson's Hawk Avoidance Measures.Prior to development,the Verification by County. Union Pacific San Joaquin County Prior to project construction
<br /> applicant shall determine the nearest Swainson's hawk nest location via the Community Development activities
<br /> California Natural Diversity Data Base(CNDDB)(CDFG, 1994)to determine Department and San
<br /> the foraging radius relative to the project site.Pre-construction Swainson's Joaquin Council of
<br /> hawk surveys shall also be conducted by a qualified biologist during the Governments if participation
<br /> appropriate time of year using approved methods.Provisions that would is sought In the SJMSCP
<br /> reduce impacts to less-than-significant levels are described in Appendix W,
<br /> State Fish and Game Staff Report Regarding Mitigation for Impacts to
<br /> Swainson's hawk in the Central Valley of the staff report on Swainson's hawk
<br /> (CDFG, 1994),summaries pertaining to the proposed project are provided
<br /> below:
<br /> 1. No intensive new disturbances(e.g.,heavy equipment operation associated
<br /> with construction)or other project-related activities that may cause nest
<br /> abandonment or forced fledging shall be initiated within one-quarter mile
<br /> (buffer zone)of an active nest between March 1—September 15 or until I
<br /> August 15 if a Management Authorization or Biological Opinion is obtained
<br /> for the project.If construction or other project-related activities that may
<br /> cause nest abandonment or forced fledging are necessary within the buffer
<br /> zone,monitoring of the nest site(funded by the project applicant)by a
<br /> qualified biologist(to determine if the nest is abandoned)shall be required.
<br /> If the nest site is abandoned and if the nestlings are still alive,the project j
<br /> applicant shall fund the recovery and hacking(controlled release of captive !
<br /> reared young)of the nestling(s).Nest trees shall not be removed unless
<br /> there is no feasible way of avoiding removal.
<br /> r ;:,: .. ,.:, „._ -:::: ..: 1 l:Y !,:^cth:,�.':FFariri'rxix'r':<'r'F-,n;,-• •!:•rs.cx•ai.- .. _ _ .orm•,r•�,:. '
<br /> .._...... - ......_-... . ......... ..._ : > a........,..n..r.ai na.:.a..n:.x:: ... .c_,i..,.lr: •...rnP.i.....rrrr..n�t....r_<•.F.4:w..o..,..rA6 Biological Resources(cont.) o
<br /> - upl'a.nc!.tg.-.:.!..�.,.,.:is..,.P.a,.rxu,..r;....,r,.T:.$).i nan,sc•n s'...�i,+'fi.•Ls'r,.'..r.:.d.Gn:`aii:c:R:'.u.',.x8.}$esS:t=Ci.l.i:ir.',.:r•rr:•�ar;.,,.•dxmh.nc.ox•.,.p,,n:..F7.•Y.uxn:r•a.'•n.:_h;.•rra,.t`:a:�,-4_ic..s«.d:.aro•.>da;.,,,r:cu:ii•?n:'i5•i_rr2+•�-:r.(r:.wo�:a7:.nrF;sr.n:.aoxShc!a.c.k:ii•c'rt,•lry,•�.^6:'MIN_
<br /> p,c..,n...f.Ao•_.,H,_,,,.�,•.I,'
<br /> .S<l
<br /> ..
<br /> 2. To mitigate for the loss of foraging habitat,project applicant shall provide
<br />
|