My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0010231
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2600 - Land Use Program
>
PA-0900184
>
SU0010231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2024 4:16:32 PM
Creation date
9/9/2019 9:09:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0010231
PE
2656
FACILITY_NAME
PA-0900184
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-
ENTERED_DATE
9/19/2014 12:00:00 AM
SITE_LOCATION
1000 E ROTH RD
RECEIVED_DATE
12/21/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\APPL.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\CDD OK.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Measures and Statements of Findings of Impacts Being Monitoring/ Responsible Monitoring/Reporting <br /> Reporting Action Party for Providing ResponsibilityTiming <br /> Significant and Unavoidable p g Mitigation <br /> 4.9 Hazards and Hazardous Materials <br /> HAZARDS-1 a:The project applicant shall require,through the enforcement of Verification by County I Union Pacific and San Joaquin County During project construction <br /> contractual obligations,that all contractors transport,store,and handle i construction contractors Environmental Health Dept. activities <br /> construction-related hazardous materials utilized in connection with construction <br /> at the project site as required by applicable law.Additionally,the project <br /> applicant shall provide a site-specific spill response plan for the project area as <br /> required by applicable law,prior to the issuance of construction permits,which <br /> shall be submitted by the applicant in support of the construction permits. <br /> During project construction,the project applicant shall require,through the <br /> enforcement of contractual obligations,that all contractors adhere to the I <br /> requirements and measures described in the site specific spill response plan. <br /> The site-specific spill response plan shall include,at minimum,the following <br /> measures and requirements: <br /> • The manufacturers'recommendations and federal,state,and local <br /> requirements shall be followed for use,storage,and disposal of chemical <br /> products used for construction,including fuels,lubricants,solvents,paints, <br /> and other potentially hazardous materials. <br /> • All refueling and maintenance activities shall occur at a dedicated area that <br /> is equipped with containment improvements and readily available spill <br /> control equipment and products or,in the case of Direct-to-Locomotive <br /> ("DTL")fueling,where locomotives are fueled throughout the yard by fuel <br /> delivery trucks,or other instances in which mobile fueling or maintenance <br /> occurs,the site specific spill response plan shall include plan elements to <br /> respond to any spills arising from DTL or other mobile fueling or <br /> maintenance, <br /> • Overtopping of construction equipment fuel gas tanks shall be avoided. , <br /> • During routing maintenance of construction equipment,site operators shall <br /> properly contain and remove grease,oils,and antifreeze. <br /> • Discarded or waste containers of fuels and other chemicals shall be <br /> properly disposed of,in accordance with federal,state,and local <br /> requirements. <br /> • Construction related hazardous materials and wastes shall be stored away <br /> from stream channels,canals,other waterways,and steep banks,in order to <br /> prevent these materials from entering into surface waters in the event of <br /> accidental release, <br /> • All precautions required by the Central Valley Regional Water Quality <br /> Control Board(CVRWQCB)-issued construction activity stormwater NPDES <br /> permits shall be implemented and adhered to. <br /> 4,9 Hazards and Hazardous Materials(cont) EM <br /> In the event of a spill,the project applicant shall ensure,through the <br /> enforcement of contractual obligations,that all contractors immediately control <br /> the source ieak and immediately contain an sill usin a ro riate s ill <br />
The URL can be used to link to this page
Your browser does not support the video tag.