Laserfiche WebLink
ResponsibleMitigation Measures and Statements of Findings of Impacts Being Monitoring/ RespMonitoring/Reporting <br /> Significant and Unavoidable Reporting Action Party for Providing Responsibility Timing <br /> Mitigation <br /> archaeologist and Native American representative,the applicant shall <br /> determine whether avoidance is necessary and feasible in light of factors such <br /> as the nature of the find,project design,costs,and other considerations.If <br /> avoidance is infeasible,other appropriate measures(e.g.,data recovery)shall <br /> be instituted.Work may proceed in other parts of the project site while <br /> mitigation for cultural resources is being carded out. <br /> rti.. .: .. .... .,,,.., n ,.:.:- .._... -'.,...i..:' ,'. .• '.I. ,..;v:r<.:.�..........:..•I.iyn:::�;,,:..;......�!....,v,4�i.,tl•. h �4i?i:•ivcr.�' <br /> 41-CttlturalResources,cont, a ,•n=,.r., F� <br /> Less than significant impact after implementation of Mitigation Measure <br /> CULTURAL-1. <br /> CULTURAL-2:The applicant and project contractors shall halt work if human Verification by County,as Union Pacific and San Joaquin County During ground disturbing <br /> remains are identified during construction.If human remains are uncovered needed construction contractors coroner and Native activities <br /> during project construction,work should immediately halt within 50 feet of the American Heritage <br /> find.The applicant shall contact the San Joaquin County coroner to evaluate Commission,with <br /> the remains and follow the procedures and protocols set forth in Section verification provided to San <br /> 15054.5(e)(1)of the CEQA Guidelines.If the County coroner determines that Joaquin County Community <br /> the remains are Native American,the Native American Heritage Commission Development Department <br /> (NAHC)shall be contacted in accordance with Health and Safety Code as applicable <br /> Section 7050.5,subdivision(c),and Public Resources Code 5097.98(as <br /> amended by AB 2641).The NAHC would then identify a Most Likely <br /> Descendent of the deceased Native American,who would engage in <br /> consultation to determine the disposition of the remains.Contract specifications <br /> shall address these requirements. <br /> Less than significant impact after implementation of Mitigation Measure <br /> CULTURAL-2. <br /> CULTURAL-3:The applicant and project contractors shall halt work if Verification by County,as Union Pacific and Qualified paleontologist, During ground disturbing <br /> paleontological resources are identified during construction.If paleontological needed construction contractors with verification provided to activities <br /> resources,such as fossilized bone,teeth,shell,tracks,trails,casts,molds,or San Joaquin County <br /> impressions are discovered during ground-disturbing activities,all ground Community Development <br /> disturbing activities within 50 feet of the find shall be halted until a qualified Department as applicable <br /> paleontologist can assess the significance of the find and,if necessary, <br /> develop appropriate salvage measures in consultation with the project sponsor <br /> and in conformance with Society of Vertebrate Paleontology Guidelines(SVP, <br /> 1995;SVP, 1996).Contract specifications shall address these requirements. <br /> Less than significant impact after implementation of Mitigation Measure <br /> CULTURAL-3. <br /> CULTURAL-4:The project applicant shall Implement Mitigation Measures See CULTURAL-1 through See CULTURAL-1 through See CULTURAL-1 through See CULTURAL-1 through <br /> CULTURAL-1 through CULTURAL-3.These measures would ensure that the CULTURAL-3 CULTURAL-3 CULTURAL-3 CULTURAL-3 <br /> project's contribution to cumulative cultural resource impacts would be less <br /> than significant, <br /> 4,$�eotoy <br /> and SousI n E <br /> .J..._.- <br /> None. <br /> I <br />