Laserfiche WebLink
Responsible <br /> Mitigation Measures and Statements of Findings of Impacts Being Monitoring/ Party for Providing <br /> Mom <br /> Reporting Action <br /> Significant and Unavoidable Mitigation Responsibility Timing <br /> 77777777 <br /> 4,11Public'isdry ebt <br /> None. <br /> _4.12 Utilities and Service,Systems <br /> i� <br /> UTILITIES-1:Implement Mitigation Measure HYDRO-1. See HYDRO-1 See HYDRO-1 See HYDRO-1 See HYDRO-1 <br /> Less than significant impact after implementation of Mitigation Measure <br /> HYRDO-1. <br /> UTILITIES-2:An addendum to the previous soil suitability/nitrate loading study Verification by County Union Pacific San Joaquin County Prior to Issuance of building <br /> for the project site(October 1993)incorporating proposed Staff and customer Environmental Health Dept- permit or expansion of the <br /> use for the expansion of the existing intermodal facility shall be submitted to septic system <br /> the Environmental Health Department,indicating that the area is suitable for <br /> septic system usage.The study must be approved by the Environmental <br /> Health Department prior to issuance of building permits.The sewage disposal <br /> system shall comply with the on-site sewage standards of San Joaquin County <br /> prior to approval.A percolation test that meets absorption rates of the manual <br /> of septic tank practice or the U.S_Environmental Protection Agency(EPA) <br /> Design Manual for on-site wastewater treatment and disposal system is <br /> required. <br /> 412V <br /> Less than significant impact after implementation of Mitigation Measure <br /> UTILITIES-2. <br /> UTILITIES-3:Implement Mitigation Measure HYDRO-2. See HYDRO-2 See HYDRO-2 See HYDRO-2 See HYDRO-2 <br /> Less than significant impact after implementation of Mitigation Measure <br /> HYRDO-2. <br /> UTILITIES-4:The project applicant shall implement Mitigation Measures See UTILITIES 1-3 See UTILITIES 1-3 See UTILITIES 1-3 See UTILITIES 1-3 <br /> UTILITIES-1 through UTILITIES-3.These measures would ensure that the <br /> project's contribution to cumulative impacts on wastewater treatment and <br /> stormwater drainage facilities would be less than significant. <br />