Laserfiche WebLink
Mr. Kai Luoma <br /> January 24, 2000 <br /> Page 2 <br /> (Refer to SMAR,q Sections 2772 H Sdrolo and Water <br /> (b)(1) (b)(2), OO and 2773(a QUalit <br /> (d) and (e); 3706(a) (b) O)(dAlseo refer to CCR Sections 3502 <br /> 2. The reclamation O (1) and (g); 3710(a), (b) and (c),.,. a 3503(1)(2) <br /> Plan should s ( ) and, 3712.) <br /> that will be used on the reclaimed ify the type slopes. <br /> of "natural" erosion control reclamation example, seeding <br /> year by which seedin mple, the species and <br /> information is g will be applied to slo plan as well as the time of <br /> control reve necessary to adequate) <br /> slopes (SMARA Section 2773 <br /> getation strategy y monitor the success of the (a)). This <br /> Plan's erosion <br /> (Refer to SiVIARA Section 2i73Rasoilln and Reve <br /> 1105(a), ( ) Also refer to CCR Sectat jOn ( )(+) a , <br /> O (b). (c), (d), (e), (�, (9), (h), (i), Is (re (I) and 503 1 <br /> (m); 3707(b) and d and �9), 3704(c); <br /> and (e)) ( ); and, 3711(a), (b) (c) (d) <br /> 3. CCR Section 3711 d <br /> protected from ( ) requires topsoil stockpiles to be clear) i <br /> stockpilin Wind and water erosion y identified and <br /> g topsoil. The reclamation We commend the operatorreclaerosimation for <br /> mix to the stockpile should The describe how the <br /> provide the necessary <br /> e on of an erosion control seed <br /> 4. y erosion control. <br /> CCR Sections 3707 and 3708 <br /> reclamation plan states that the site will be reclai <br /> address reclamation of agricultural lands. The <br /> Because of the specific re Med to an almond orchard <br /> agricultural land end uses quirements of SMA <br /> mining , the reclamation planA eedsregulttoospecify with respect to <br /> site is prime agricultural land or not. If the pre-mining e whether the <br /> agricultural land, as defined b <br /> must be returned to ane y the USD mining site is prime vice <br /> equivalent or better oil fertiRlity level esource Conservation Service, it <br /> must specify this and describe how the restoration o <br /> It should be noted that reclamation is deemed The reclamation <br /> capability of the affected land is equivalentf soil capability plan <br /> complete onlyy �'iil be achieved. <br /> years, that of the condition. <br /> Iftto or exceeds for two consecutiven he tive <br /> on the site, the reclaimed' existing <br /> If there was no <br /> capacity of similar cropped pre-existin crop <br /> should be equal to, or better than,°p production <br /> must be based on identified Plre erence areas in the sthe <br /> Productivity rates or soil fertility levels <br /> reclamation plan. and specified in the approved <br /> If the site is not on prime agricultural land CC <br /> at <br /> agricultural lands be reclaimed to an agricultural Section 3708 re <br /> economically viable production of crops capability level that canquires sustain <br /> Since it may take time before the orchard commonly <br /> grown in the surroundin the <br /> matures and has reached the g areas. <br /> Productivity <br />