My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004114
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23808
>
2600 - Land Use Program
>
QX-99-0003
>
SU0004114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 4:28:01 PM
Creation date
9/9/2019 10:08:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004114
FACILITY_NAME
QX-99-0003
STREET_NUMBER
23808
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
ESCALON
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
23808 S SANTA FE RD
RECEIVED_DATE
12/28/1998 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\S\SANTA FE\23808\QX-99-03\SU0004114\EH TRACK LOG.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUARRY EXCAVATION APPLICATION <br /> RECLAMATION PLAN—AGGREGATES, INC. <br /> PAGE FIVE <br /> III. DESCRIPTION OF PROPOSED RECLAMATION: <br /> A. SUBSEQUENT USE(S): Parcel will be reclaimed back to farming capability, <br /> expected to be a 80 +/- acre walnut orchard. Owner(s) of possessory interest <br /> have been notified and document is attached. <br /> B. RECLAMATION SCHEDULE: Placement of topsoil is concurrent with <br /> mining. Project is proposed in two phases. At the completion of excavation <br /> in each phase, the land will be prepared for planting; disking, leveling, etc. <br /> Reclamation of each phase will be completed within two years of mining <br /> cessation. Reclamation Site Plan attached. <br /> C. POST MINING TOPOGRAPHY: Map of proposed post-reclamation <br /> topography is attached. Cross sections through slopes, cuts, and fills are <br /> shown. Original ground,post-mining surface, underlying geologic conditions <br /> and reclaimed surface are shown on Reclamation Site Plan. For reclamation <br /> purposes, it is desirable to have gradual slopes to allow additional planting of <br /> trees on the slopes. Final slopes will be determined by topsoil availability. <br /> D. IMPOUNDMENTS: No impoundments on site to be reclaimed. <br /> E. DRAINAGE: The use of solid set sprinklers should alleviate any drainage or <br /> water run-off concerns. Proper leveling, sloping and small berms around the <br /> orchard should preclude drainage from the reclaimed site. <br /> F. DISPOSITION OF OLD EQUIPMENT: All equipment used at this site is <br /> mobile and will be removed upon completion of the project. <br /> G. REVEGETATION: The average thickness of the topsoil will vary from 7—9 <br /> feet based on boring logs. The replaced topsoil will be properly tilled to <br /> prevent over compaction in the preparation for planting. Typically,planting <br /> of the trees will commence in 20 acre blocks when preparation of the land is <br /> completed. The farming operation will be under the management of a local <br /> grower who has extensive farming operations, primarily orchards, in San <br /> Joaquin County. The application of soil amendments will be used at his <br /> discretion. The orchard will be planted by hand, using cuttings; generally <br /> early spring of the year. Irrigation will be by solid set sprinklers using the <br /> onsite well for the water supply. <br />
The URL can be used to link to this page
Your browser does not support the video tag.