My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004114
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23808
>
2600 - Land Use Program
>
QX-99-0003
>
SU0004114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 4:28:01 PM
Creation date
9/9/2019 10:08:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004114
FACILITY_NAME
QX-99-0003
STREET_NUMBER
23808
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
ESCALON
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
23808 S SANTA FE RD
RECEIVED_DATE
12/28/1998 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\S\SANTA FE\23808\QX-99-03\SU0004114\EH TRACK LOG.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUARRY EXCAVATION APPLICATION <br /> RECLAMATION PLAN—AGGREGATES, INC. <br /> PAGE FOUR <br /> 3. OVERBURDEN/WASTE/ORE: This is an open pit mine using dozers, <br /> scrapers, loaders, graders as necessary. No explosives are used. Maximum <br /> anticipated depth of the mine will be 25' determined by availability of sand <br /> and gravel. Final working slopes will not exceed 2:1. <br /> 4. MINE WASTE: Processing of materials will not occur within project site. <br /> All merchantable material is transported off--site to an existing processing <br /> plant approximately three miles from the project site. There will be no waste <br /> discharge at the project site. <br /> D. SIZE: <br /> 1. Total acreage to be permitted: 81.5 acres. <br /> 2. Total acreage to be disturbed: 78 acres. <br /> 3. Total acreage to be reclaimed: 80 +/- acres. <br /> E. WATER REQUIREMENTS: Approximately 14,000 gallons of water is used <br /> daily when operation is active. Water is used for dust suppression. <br /> Approximately 2,240,000 gallons of water is used annually. <br /> F. CONTAMINANTS: No contaminants are used in the excavation activities. <br /> No imported wastes are disposed of at the project site. <br /> G. WASTE WATER: There is no processing of materials; therefore, no waste <br /> water involved with this project. <br /> H. WATER IMPOUNDMENTS AND DIVERSIONS: None at this site. <br /> 1. ORE PROCESSING: No processing at the site. All merchantable materials <br /> are transported to existing processing plant approximately three miles from <br /> project site. 2--3 trucks are used to transport these materials on a daily <br /> average. <br /> J. IN-STREAM MINING: Does not apply to this project site. <br /> K. OTHER INFORMATION: None <br />
The URL can be used to link to this page
Your browser does not support the video tag.