Laserfiche WebLink
Rick Griffin -2- <br /> Community Development Department <br /> PA-0900163 (UP) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolutions R-00- <br /> 433) <br /> 4. The Regional Transportation Impact Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit application. The fee is based on the current schedule. (Resolution R- <br /> 06-38) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> Informational Notes: <br /> (i.) This property is subject to the requirements of San Joaquin County Mosquito&Vector Control District <br /> (209-982-4675) and the California Health and Safety Code for the prevention of mosquitoes.Best <br /> Management Practices (BMP) guidelines for stormwater devices,ponds and wetlands are available. <br /> (ii.) All future building permits for projects located within a Special Flood Hazard Area at the time of permit <br /> issuance shall meet the San Joaquin County flood hazard reduction requirements(Title 9,Chapter 9-1605) <br /> and all requirements of the State of California (CCR Title 23)that are in force at the time of permit <br /> issuance. As an example, these requirements may include raising the finish floor elevation one foot above <br /> the expected flood level and/or using flood resistant materials. <br /> BD: <br /> \\Pwsrvfpol\shares\DevSer ices\DPubSer \COMMENTS\UP\YR 2009\PA-0900163.doc <br />