Laserfiche WebLink
Conditions of Approval <br /> UP 88-19 <br /> Page -14- <br /> v. Schulte Road/No. 1 and No 2 truck stop driveways and <br /> Gateway Business Park entrance: <br /> Eastbound Schulte Road approach - two through lanes <br /> and one right-turn lane. <br /> Westbound Schulte Road approach - two through lanes <br /> and one left turn lane. <br /> Nort_ibound driveway approach - one right-turn lane <br /> and one left-turn lane. <br /> W. Schulte Road/Safeway truck entrance: <br /> Eastbound Schulte Road approach - two through lanes <br /> and one right-turn lane. <br /> Westbound Schulte Road approach - one through lane <br /> and one left turn lane. <br /> Northbound driveway approach - one right-turn lane <br /> and one left-turn lane. <br /> X. Hansen Road driveway entrances: <br /> Northbound Hansen Road approach - one through lane. <br /> ° Southbound Hansen Road approach - one through lane <br /> and one dedicated right turn lane. <br /> Eastbound driveway approach - one left turn lane <br /> and one left/right turn lane. <br /> Y_ Patterson Pass Road, Schulte Road to I-205 • <br /> Minimum lane configuration: <br /> One through lane each direction. <br /> Integration of existing roadway into the new <br /> roadway section is subject to review of structural <br /> strength of existing roadway and final alignment <br /> and phasing of roadway construction. <br /> Turn lanes at intersection plus auxiliary lanes. <br /> Any additional improvements at the I-205 <br />