Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> SA-92-18 <br /> JOHN i ELLA ARNETT <br /> Unless otherwise specified, all the Conditions of Approval shall be <br /> fulfilled prior to the issuance of any building permits and prior <br /> to the initiation of the use. <br /> This approval will expire eighteen (18) months from the effective <br /> date of the approval unless (1) all Conditions of Approval have <br /> been complied with, (2) all necessary building permits have been <br /> secured and remain in force, and (3) all necessary permits from <br /> other agencies have been secured and remain in force. <br /> Those Conditions followed by a Section Number or other Statutory <br /> Requirement are based on Ordinance requirements. Ordinance <br /> Requirements cannot be modified. <br /> 1. DEVELOPMENT SERVICES DIVISION: <br /> a. This approval shall be for the repair of farm equipment <br /> without combustion engines in a new 5, 000-square foot <br /> building. There shall be no repair, maintenance or <br /> storage (except service vehicles) of combustion engines <br /> as a part of this approval. There shall be no <br /> manufacturing activities associated with this approval. <br /> b. The existing 2,400-square foot structure shall only be <br /> used as an agricultural storage building. <br /> C. All farm equipment repair work shall take place within <br /> the approved structure. There shall be no outdoor <br /> activities associated with the permitted use. <br /> d. There shall be no outdoor storage of equipment or <br /> materials as a part of this approval. All equipment and <br /> material associated with the use that are currently <br /> stored outside shall be removed from the site or stored <br /> within the new 5, 000-square foot structure prior to the <br /> issuance of the certificate of occupancy and initiation <br /> of use in, that building. <br /> e. Service vehicles shall be stored within the permitted <br /> structure. <br /> f. The owner shall secure an approved Business License prior <br /> to the issuance of the certificate of occupancy and <br /> initiation of the use in the new 5, 000-square fort <br /> building. <br />