My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SPUD
>
11330
>
2600 - Land Use Program
>
PA-0500224
>
SU0005021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 4:37:01 PM
Creation date
9/9/2019 10:19:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005021
PE
2626
FACILITY_NAME
PA-0500224
STREET_NUMBER
11330
Direction
W
STREET_NAME
SPUD
STREET_TYPE
IS
City
STOCKTON
APN
12929001
ENTERED_DATE
5/5/2005 12:00:00 AM
SITE_LOCATION
11330 W SPUD IS
RECEIVED_DATE
4/26/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\S\SPUD ISLAND\11330\PA-0500224\SU0005021\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MITIGATION MOM RING PROGRAM <br /> Impact Mitigation Measures Monitoring Person/Agency <br /> Requirements Responsible <br /> California Black If feasible,conduct all tree and shrub removal and grading during *A note shall be JONES AND <br /> Rail the nonbreeding season(generally between August 16 and placed on the STOKES/CDD <br /> February 28). Improvement <br /> If construction activities are scheduled to occur during the Plan indicating <br /> When <br /> breeding season,between March I and August 15,a qualified <br /> construction <br /> wildlife biologist(with knowledge of this species)shall be <br /> retained to conduct a focused nest survey 1 week prior to the start activity shall <br /> of construction in or near suitable nesting habitat within the occur. <br /> construction work area and up to 500 feet outside it. *TIMING: AT <br /> If active nests are present,construction must not occur within 50o TIME OF <br /> feet of the nest sites,and environmental training must be BUILDING <br /> conducted. PLAN <br /> SUBMITTAL <br /> Giant Garter Snake All construction activity within giant garter snake aquatic and *Every six USFWS/ COG <br /> upland habitat must be conducted between May I and October 1, months,a report <br /> the active period for giant garter snakes. This would reduce direct shall be <br /> impacts on the species because the snakes would be active and submitted by <br /> respond to construction activities by moving out of the way. Jones and <br /> A biologist shall conduct a preconstruction survey in suitable Stokes to <br /> USFWS and <br /> habitat no more than 24 hours before construction and shall be <br /> COG with <br /> onsite during construction activity in potential aquatic and upland <br /> of <br /> habitat. The construction area shall be resurveyed whenever there updates ti <br /> construction <br /> is a lapse in construction activity of 2 weeks or more. activity. <br /> If a giant garter snake is encountered within the construction work <br /> area,construction activities must cease until the snake moves out *TIMING: <br /> of the work area unassisted. Capture and relocation of trapped or ON-GOING <br /> injured individuals can only be attempted by USFWS-permitted <br /> personnel. The applicant or its contractors must notify USFWS <br /> within 24 hours and submit a report; including dates,locations, <br />
The URL can be used to link to this page
Your browser does not support the video tag.