Laserfiche WebLink
MITIGATION MONITORING PROGRAM <br /> habitat description,and any corrective measures taken to protect <br /> the snake(s)encountered. For each giant garter snake <br /> encountered,the biologist must submit a completed CNDDB field <br /> survey form(or equivalent)to DFG no more than 90 days after <br /> completing the last field visit to the project site. <br /> A qualified biologist shall perform environmental training to <br /> inform all construction personnel about the life history of the <br /> giant garter snake. <br /> Western Pond Retain a qualified wildlife biologist to conduct a preconstruction *Every six DFG/COG <br /> Turtle survey for western pond turtles no more than 24 hours before the months,a report <br /> start of construction and move any turtles within the construction shall be <br /> area to a suitable aquatic site,outside the construction area. submitted by <br /> Consult with DFG if an active pond turtle nest containing either Jones and <br /> pond turtle hatchlings or eggs is found to determine and Stokes to DFG <br /> and COG with <br /> implement the appropriate avoidance measures. These may updates of <br /> include a"no disturbance"buffer around the nest site until the <br /> hatchlings have moved to a nearby aquatic site. construction <br /> activity. <br /> *TIMING: <br /> ON-GOING <br /> Swainson's Conduct all tree and shrub removal and grading during the *A note shall be JONES AND <br /> Hawk/Raptors nonbreeding season(generally between August 16 and February placed on the STOKES/COG/ <br /> 28), if feasible. Improvement CDD <br /> If construction is to be done during the breeding season,retain a Plan indicating <br /> qualified wildlife biologist to conduct nesting surveys and identify When <br /> nesting habitat one week prior to the start of construction in or construction <br /> activity shall <br /> near suitable nesting habitat within the construction work area and occur. <br /> up to 500 feet outside it. <br /> If active nests are present,construction shall not occur within 500 *TIMING:AT <br /> feet of the nest sites,and environmental training shall be TIME OF <br /> BUILDING <br />