Laserfiche WebLink
MITIGATION MONf RING PROGRAM <br /> conducted. PLAN <br /> SUBMITTAL <br /> TriColored A preconstruction survey shall be conducted to look for nesting *A note shall be JONES AND <br /> Blackbird colonies. If colonies are observed,construction activities shall placed on the STOKES/COG/ <br /> not occur within 500 feet of these areas,and a qualified biologist Improvement CDD <br /> shall perform environmental training to inform all construction Plan indicating <br /> personnel about the tricolored blackbird. construction <br /> activities shall <br /> occur not occur <br /> within 500 feet / <br /> of these areas. <br /> *TIMING:AT <br /> TIME OF <br /> BUILDING <br /> PLAN <br /> SUBMITTAL <br /> VELB habitat If construction will occur within 20 feet of an elderberry shrub, *A note shall be USFWS/DFG/ <br /> the applicant or its contractor shall ensure that a minimum 4-foot- placed on the COG/CDD <br /> tall temporary,plastic mesh-type construction fence(Tensor Improvement <br /> Polygrid or equivalent)is installed at least 20 feet from the Plan indicating <br /> driplines of elderberry shrubs before any ground-disturbing location of fence <br /> activity occurs. This fencing is intended to prevent encroachment and sign. <br /> by construction vehicles and personnel. The exact location of the <br /> fencing shall be determined by a qualified biologist,with the goal *TIMING:AT <br /> of protecting sensitive biological resources(i.e.,habitat for the TIME OF <br /> VELB). The fencing shall be strung tightly on posts set at a BUILDING <br /> maximum interval of 10 feet. The fencing shall be installed in a PLAN <br /> way that prevents equipment from enlarging the work area SUBMITTAL <br /> beyond what is necessary to complete the work. The fencing shall <br /> be checked and maintained weekly until all construction is *Every six <br /> completed. This buffer zone shall be marked by a sign stating the months,a report <br /> following: shall be <br /> submitted b <br />