Laserfiche WebLink
ENVIRONMENTAL HEALTH DEPARTMENT <br /> U N SAN JOAQUIN COUNTY <br /> Donna K.Heran,R.E.H.S. Unit Supervisors <br /> Director 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> 1 Al Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> Program Manager <br /> \• Douglas las W.Wilson,R.E.H.S. <br /> �iFoacLaurie A.Cotulla,R.E.H.s. Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Robert McClellon,R.E.H.S. <br /> Fax: (209) 464-0138 <br /> Program Manager Mark Barcellos,R.E.H.S, <br /> April 16, 2002 <br /> TO: San Joaquin County <br /> Community Development Department 41&N� <br /> FROM: San Joaquin County <br /> Environmental Health Department <br /> CONTACT PERSON: Lisa Medina, R.E.H.S. <br /> "� ty' <br /> PHONE NUMBER: (209) 468-3455 <br /> RE: PA-02-108 (SA), Attention Rick Griffin <br /> 3685 East Stevenson Avenue, Stockton <br /> The San Joaquin County Development Title Requirements listed below have been identified as <br /> pertinent to this project. Other requirements may also apply. These requirements cannot be <br /> modified. <br /> A. Environmental Health Department requires a soil suitability/nitrate loading study <br /> incorporating the number of employees and proposed customers, indicating that the area is <br /> suitable for septic tank usage. This must be performed prior to issuance of building permits <br /> (San Joaquin County Development Title, Section 9-1105.2(d)). A nitrate loading study is <br /> required, and a review fee of$445.00 must be paid at time of submittal to Environmental <br /> Health Department. <br /> The sewage disposal system shall comply with the on site sewage standards of San Joaquin <br /> County prior to approval. A percolation test that meets absorption rates of the manual of <br /> septic tank practice or E.P.A. Design Manual for onsite wastewater treatment and disposal <br /> system is required for each parcel. A permit fee of$89.00 per percolation hole is required. <br /> / B. State on revised site plans the maximum number of employees and proposed customers the <br /> sewage disposal system is being designed for. In addition, show on revised plans that the <br /> leach field area will be barricaded so it cannot be driven over,parked on, or used as a storage <br /> area. This leach field area must be used for that specific purpose only, and it cannot contain <br /> any underground utility lines (San Joaquin County Development Title, Section 9- <br /> 1110.4(c)(5)) <br /> r <br /> Page 1 of 2 <br />