Laserfiche WebLink
(5) A maintained security chain-Gnk fencing with slats or elastic fabricfer�r_q_, may <br /> be permitted for industrial projects if combined with landscaping acceptable to <br /> the Review Authority. <br /> h. COMPLIANCE DATE: Because this development is currently operating without the <br /> required permits, the Site Plan shall be submitted within 60 days from the effective slate <br /> of approval. Enforcement action will be deferred if the Site Plan is submitted within W <br /> days and the Conditions of Approval are met within six months from the effective date.OF <br /> approval. <br /> i. EFFECTIVE DATE OF APPROVAL: This Use Permit shall become effective 30 days <br /> after adoption of Zone Reclassification No. ZR-98-5. <br /> J_ The heave equipment weidin4 and repair shall be limited to equipment owned c�r_[eased <br /> by Alegre Trucking/Alegre Construction or its currently related ownership entities. <br /> k. The scope of the welding and repairs for the accessory use shall remain cons trt_wi* <br /> the historical averages regarding frequency and increased activity. <br /> I. All parts and ino erable trucks are to be located to the rear of the site. This conditierks <br /> shall be implemented within ninety (901 days after the effective date of am mval of e <br /> conditions and the Text Amendment. <br /> 2. DEPARTMENT OF PUBLIC WORKS (Staff Contact: Gabe Karam, 468-3000) <br /> a. The Traffic Impact Mitigation Fee will be required. The fee is due and payable at the <br /> time of building permit application or Site Plan approval. The fee currently is $148,90 <br /> per additional daily trip-end generated in the Lodi area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by <br /> the Engineering News Record. <br /> b. Any dedications, improvements, or permits for State Route 12 shall be as required by. <br /> Caltrans. <br /> 3. PUBLIC HEALTH SERVICES (Staff Contact: Steve Mindt, 468-0343) <br /> a. Any future expansion shall require public sewer and amendment to the public water <br /> system. (Development Title Section 9-1120.2) <br /> b. Repair the existing septic system under a sanitation permit and inspection by the <br /> Environmental Health Division (Development Title Sections 9-1110.3 and 9-1110.4). <br /> The office septic tank must be brought into compliance and the lid access repaired. <br /> C. A soil suitability study which indicates that the area is suitable for septic tank usage must <br /> be performed prior to acceptance of the application (Development Title Section 9- <br /> 1105.2[dU. A nitrate loading study is required, and a review fee of$390.00 must be paid <br /> at the time of submittal to the Environmental Health Division. This study must be <br /> performed prior to recording the map. <br /> d. The sewage disposal system shall comply with the on-site sewage standards of San <br /> Joaquin County prior to approval. A percolation test that meets absorption rates of the <br /> manual of septic tank practice or the EPA Design Manual for on-site waste water <br /> treatment and disposal systems is required for each parcel. A permit fee of$78.00 per <br /> percolation hole is required. <br /> -6- <br />