Laserfiche WebLink
f <br /> -5- <br /> m. All utilities shall be underground except power <br /> transmission facilities of 35 KV or greater. Public <br /> utility easements shall be provided along the road <br /> frontage of the subdivision and as required by the <br /> public utility companies. (Development Title Section <br /> 9-1155. 2) <br /> n. The subdivider shall agree to and shall pay user fees <br /> for the utility services from the time improvements are <br /> accepted by the County until the lot is placed on the <br /> County tax rolls, or up to an 18-month period, as the <br /> case may be. (Subdivision Map Act Section 66493) <br /> o. All traffic signs and markings shall conform to the <br /> Manual on Uniform Traffic Control Devices and San <br /> Joaquin County standards, and they shall be shown on <br /> the improvement plans. (Development Title Section 9- <br /> 1150. 2) <br /> P- Access rights shall be dedicated and restricted along <br /> the frontage of state Highway Route 12 . (Development <br /> Title Section 9-1150. 5) <br /> q. Water meters shall be installed on all water services. <br /> (Board of Supervisors Order B-91-650) <br /> r. An Offer of Dedication of ground water rights is <br /> required. <br /> S. Parcel 1 shall not be developed until improvements for <br /> Flag City (saddle City) have been accepted for <br /> maintenance by San Joaquin County, which shall be noted <br /> by a statement on the Parcel Map. <br /> t. The tentative map shall be revised as follows: <br /> (1) Sanitary, water, and storm drainage facilities <br /> shall not be shown on the tentative map. <br /> (2) The location of the well. site (lettered lot) shall <br /> be shown. <br /> (3) The location of the detention pond site (lettered <br /> lot) shall be shown. <br /> (4) Existing streets shall be renamed as approved by <br /> RN-94--1. <br /> (5) The tentative map shall clearly show the actual <br /> "Designated Remainder. " <br />