Laserfiche WebLink
pully <br /> COUNTY OF SAN JOAQUIN <br /> 2•. y THOMAS R. FLlNN <br /> DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> P.O. BOX 1810- 1810 EAST HAZELTON AVENUE MANUEL LOPEZ <br /> STOCKTON,CALIFORNIA 95201-1810 <br /> DEPUTY DIRECTOR <br /> 209/468-3000 STEVEN WINKLER <br /> 9 I F O Rte` FAX:209/468-2999 DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> R�����1 <br /> February 20, 1998 FEB 2 3 1999 <br /> ommunity Development DeDt. <br /> M E M O R A N D U M <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Chandler T. Martin <br /> FROM: Richard W. Hieb, Engineering Assistant III <br /> Public Services Division <br /> �i� <br /> SUBJECT: MS-98-2 A MINOR SUBDIVISION APPLICATION TO DIVIDE A 114-ACRE <br /> PARCEL INTO TWO 57-ACRE PARCELS, LOCATED ON THE SOUTH SIDE OF <br /> STATE HIGHWAY ROUTE 26, OPPOSITE BALDWIN LANE. (DISTRICT 2) . <br /> APPLICANT: Fremont Industrial Association APN: 101-250-09 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area. <br /> State Highway Route 26 has an existing right-of-way width of 80 feet and a <br /> planned right-of-way width as required by Caltrans . <br /> The Traffic Impact Mitigation Fee will be required when parcels are developed. <br /> The fee is due and payable at the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee will be required when <br /> parcels are developed. The fee is due and payable at the time of building <br /> permit application. <br /> RECOMMENDATIONS : <br /> 1 . A Parcel Map is required. (Development Title Section 9-915 . 2) <br /> 2 . Any dedications, improvements or permits for State Highway Route 26 shall <br /> be as required by Caltrans . <br />