Laserfiche WebLink
Rick Griffin 3- <br /> CONCWMTY DEVELOPMENT <br /> PA-0800266(UP) <br /> 12. Dischargers whose projects disturb 1 or more acres of soil or whose projects disturb less than 1 acre but are <br /> part of a larger common plan of development that in total disturbs 1 or more acres,are required to obtain <br /> coverage under the General Permit for Discharges of Storm Water Associated with Construction Activity <br /> (Construction General Permit,99-08-DWQ). Construction activity subject to this permit includes clearing, <br /> grading and disturbances to the ground such as stockpiling,or excavation,but does not include regular <br /> maintenance activities performed to restore the original line,grade,or capacity of the facility. <br /> 13. The site shall be designed to contain the storm water runoff on site and to prevent offsite sediment transport. <br /> BD: <br /> %jpwgov-w&hem\OmSmi=DPabSav�COMMENFSH WkYR 20061PA43W266.dm <br />