My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007761
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TEEPEE
>
2331
>
2600 - Land Use Program
>
PA-0900139
>
SU0007761
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:14 AM
Creation date
9/9/2019 10:33:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007761
PE
2631
FACILITY_NAME
PA-0900139
STREET_NUMBER
2331
Direction
N
STREET_NAME
TEEPEE
STREET_TYPE
DR
City
STOCKTON
APN
13208039
ENTERED_DATE
6/15/2009 12:00:00 AM
SITE_LOCATION
2331 N TEEPEE DR
RECEIVED_DATE
6/12/2009 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TEEPEE\2331\PA-0900139\SU0007761\APPL.PDF \MIGRATIONS\T\TEEPEE\2331\PA-0900139\SU0007761\CDD OK.PDF \MIGRATIONS\T\TEEPEE\2331\PA-0900139\SU0007761\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L J <br /> Rick Griffin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-0900139 (SA) <br /> 2. The Traffic Impact Mitigation Fee might be required for this development. A determination will be made <br /> when the Final Site Plan and building permit plans are submitted for approval.The fee is due and payable at <br /> the time of building permit application. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolution R-00-433) <br /> 3. The Regional Transportation Impact Fee might be required for this development. A determination will be <br /> made when the Final Site Plan and building permit plans are submitted for approval. The fee is due and <br /> payable at the time of building permit application. The fee is based on the current schedule. (Resolution R-06- <br /> 38) <br /> 4. The Water Supply Facilities Impact Mitigation Fee might be required for this development. A determination <br /> will be made when the Final Site Plan and building permit plans are submitted for approval. The fee is due and <br /> payable prior to issuance of the building permit. The fee shall be automatically increased on January 1 of each <br /> year through the year 2015 at the rate of 4.55 percent.) (Development Title Section 9-818.4 and Resolutions <br /> R-91-327, R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon submittal <br /> of verification. <br /> 7. The proposed project is classified as a Priority Project in the County Phase I National Pollutant discharge <br /> Elimination Permit and must comply with the county Water Quality Control Criteria Plan by filtering, treating <br /> or infiltrating the 85`x'percentile storm if there is any outdoor storage of any products. <br /> Informational Notes: <br /> (i.) Any substantial improvements to the structure (i.e. if cost to improve is 50% or greater than the market value <br /> of the structure), the entire structure must be elevated so that the finished floor elevation is at minimum one <br /> foot above the 100 year flood elevation. In this case, 28 feet is the minimum floor elevation. <br /> BD: <br /> \\Pwsrvfp0l\shares\Devservices\DPubsery\COMMENTS\SA\YR 2009\PA-0900139.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.