Laserfiche WebLink
L J <br /> Rick Griffin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-0900139 (SA) <br /> 2. The Traffic Impact Mitigation Fee might be required for this development. A determination will be made <br /> when the Final Site Plan and building permit plans are submitted for approval.The fee is due and payable at <br /> the time of building permit application. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolution R-00-433) <br /> 3. The Regional Transportation Impact Fee might be required for this development. A determination will be <br /> made when the Final Site Plan and building permit plans are submitted for approval. The fee is due and <br /> payable at the time of building permit application. The fee is based on the current schedule. (Resolution R-06- <br /> 38) <br /> 4. The Water Supply Facilities Impact Mitigation Fee might be required for this development. A determination <br /> will be made when the Final Site Plan and building permit plans are submitted for approval. The fee is due and <br /> payable prior to issuance of the building permit. The fee shall be automatically increased on January 1 of each <br /> year through the year 2015 at the rate of 4.55 percent.) (Development Title Section 9-818.4 and Resolutions <br /> R-91-327, R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon submittal <br /> of verification. <br /> 7. The proposed project is classified as a Priority Project in the County Phase I National Pollutant discharge <br /> Elimination Permit and must comply with the county Water Quality Control Criteria Plan by filtering, treating <br /> or infiltrating the 85`x'percentile storm if there is any outdoor storage of any products. <br /> Informational Notes: <br /> (i.) Any substantial improvements to the structure (i.e. if cost to improve is 50% or greater than the market value <br /> of the structure), the entire structure must be elevated so that the finished floor elevation is at minimum one <br /> foot above the 100 year flood elevation. In this case, 28 feet is the minimum floor elevation. <br /> BD: <br /> \\Pwsrvfp0l\shares\Devservices\DPubsery\COMMENTS\SA\YR 2009\PA-0900139.doc <br />