Laserfiche WebLink
< THOMAS R. FLINN P.O. BOX 1810-1810 E. HAZELTON AVENUE <br /> DIRECTOR STOCKTON,CALIFORNIA 95201 <br /> :P (209)468-3000 FAX(209)468-2999 <br /> qFORa� www.sjgov.org/pubworks <br /> THOMAS M.GAU <br /> CHIEF DEPUTY DIRECTOR Y <br /> MANUEL SOLORIO wore lg 1o' YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> ROGERJANES <br /> BUSINESS ADMINISTRATOR R EC F IV F D <br /> MAY 1 1 ,nn7 <br /> May 11, 2007 Ce)mmuMy Nvei pwrlt Dept. <br /> MEMORANDUM <br /> TO: Raymond Hoo, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Jason Jones <br /> FROM: Dean Gilman, Engineer IV <br /> Public Services Division fi_�_ <br /> SUBJECT: PA-07-131 A MINOR SUBDIVISION APPLICATION TO SUBDIVIDE ONE PARCEL INTO <br /> TWO PARCELS. PARCEL ONE AND PARCEL TWO TO CONTAIN 8,500 SQUARE FEET <br /> EACH, LOCATED ON THE SOUTHEAST CORNER OF "B" STREET AND EAST <br /> THIRTEENTH STREET. (SUPERVISORIAL DISTRICT 1) <br /> PROPERTY OWNER: Alfonso& Maricela Manzo APPLICANT: Art Matedne, DHR Construction <br /> ADDRESS: 2002 E. Thirteenth Street APN: 171-200-36 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> "B"Street has an existing right-of-way width of 65-feet and a planned right-of-way width of 80-feet. <br /> Thirteenth Street has an existing right-of-way width of 50-feet and a planned right-of-way width of 50-feet. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Regional Traffic Impact Fee will be required when parcels are developed. The fee is due and payable at the <br /> time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee shall be required when parcels are developed. The fee is due <br /> and payable at the time of building permit application. <br /> RECOMMENDATIONS: <br /> 1. A Parcel Map is required. (Development Title Section 9-915.2) <br /> 2. All easements of record shall be shown on the Parcel Map. (Development Title Section 9-910.20) <br /> 3. The frontage improvements for Thirteenth Street shall be constructed in conformance with the standards for <br /> one-half of a fifty (50)-foot right-of-way Local Residential Street prior to approval of the Parcel Map. <br /> (Development Title Section 9-1150.2[d][31) <br />