My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006495
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
13TH
>
2002
>
2600 - Land Use Program
>
PA-0700031
>
SU0006495
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2019 9:19:48 AM
Creation date
9/9/2019 10:34:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006495
PE
2622
FACILITY_NAME
PA-0700031
STREET_NUMBER
2002
Direction
E
STREET_NAME
13TH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17120036
ENTERED_DATE
4/3/2007 12:00:00 AM
SITE_LOCATION
2002 E 13TH ST
RECEIVED_DATE
4/3/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\T\THIRTEENTH\2002\PA-0700031\SU0006495\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*moo <br /> Raymond Hoo -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-07-131 (MS) <br /> 4. The project shall be served by a public sewer collection system constructed in conformance with the <br /> requirements of the San Joaquin County Public Health Services Environmental Services Division and the <br /> Department of Public Works. Sewer service shall be provided by the City of Stockton. (Development Title <br /> Section 9-1105.2) <br /> 5. The project shall be served by a public water system conforming to the requirements of the San Joaquin <br /> County Public Health Services Environmental Health Division and the Department of Public Works. <br /> Service shall be provided by California Water Service Company. (Development Title Section 9-1115.2) <br /> 6. A terminal drainage system shall be provided to meet the requirements of the County and to provide <br /> adequate drainage for the subdivision. Applicant shall submit engineering calculations and drainage plan <br /> for review prior to approval of the Parcel Map. Service shall be provided by Morrison Gardens Storm Drain <br /> System. (Development Title Section 9-1135.3) <br /> 7. This development may be subject to reapportionment under the San Joaquin Area Flood Control Agency <br /> Assessment District No. 96-1 (Flood Protection Restoration Project). Contact Jenifer Storsteen with <br /> MuniFinancial at(800)700-6864, extension 1534,to determine if there is a current remaining lien that is <br /> subject to the reapportionment process,. Any fees and/or remaining lien payoffs related to the SJAFCA <br /> assessment shall be paid prior to recording of Notice of Lot Line Adjustment/Parcel Map/Final Map. <br /> 8. All improvements shall be in conformance with the current Improvement Standards and Specifications of <br /> the County of San Joaquin. All improvement plans and specifications shall include grading plan for each <br /> individual lot, if applicable. These improvement plans and specifications are subject to plan check, field <br /> inspection fees and must be approved by the County of San Joaquin Department of Public Works prior to <br /> approval of the Parcel Map. (Development Title Section 9-240, Section 9-910, Section 9-1100 and R-92- <br /> 814) <br /> 9. All traffic signs and markings shall conform to the Manual on Uniform Traffic Control Devices, CalTrans <br /> Traffic Manual and/or San Joaquin County Standards and shall be shown on the improvement plans. <br /> (Development Title Section 9-1150.2) <br /> Note: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a <br /> State NPDES construction permit. <br /> DG:DS:av <br /> P:\COMMENTS\MS\YR 2007\PA-0700131 APPLICATION-pd <br />
The URL can be used to link to this page
Your browser does not support the video tag.