Laserfiche WebLink
b. Submit to Environmental Health revised site plans showing the maximum number of employees and <br /> customers orparishioners the sewage disposal system is being designed for. In addition, show on <br /> revised plans,that the leach field area will be barricaded so that it cannot be driven-over, parked on, <br /> or used as astorage area. This leach field area must be used for that specific purpose only, and it <br /> cannot contb1n any underground utility lines (Development Title Section 9-1110.4[c][5]), <br /> In addition, A revised site plan shall incorporate the 100 percent designed sewage disposal <br /> replacement area. <br /> c. ConstructioMof an individual sewage disposal system under permit and inspection by Environmental <br /> Health is required at the time of development based on the Soil Suitability/Nitrate Loading Study <br /> findings(Development Title Sections 9-1110.3 and 9-1110.4) <br /> d. Should the number of nonresident individuals exceed 24 for at least 60 days per year, or the number <br /> of service connections exceed-four, a yearly permit to operate a public water system will be required <br /> by Environmental Health (Development Title Sections 9-1120.2 and 9-1115.9). <br /> k " <br /> i The supplier Must possess adequate financial, managerial, and technical capability to ensure the <br /> delivery of pure, wholesome, and potable drinking water in accordance with Development Title <br /> Sections 9-1 120.2 and 9-1115.9, CCR,Title 22, and Health and Safety Code Sections 116525 <br /> i through 116570. <br /> 4. SAN JOAQIN COUNCIL OF GOVERNMENTS(Staff Contact: Anne-Marie Poggio, 468-3913) <br /> a. This project is subject to the San Joaquin County Multi-Species Habitat Conservation and Open <br /> Space Plan (SJMSCP)and is located within the unmapped land use area. Per requirements of the <br /> SJMSCP, unsnapped projects are subject to case-by-case review. This can be a 90-day process, <br /> and it is recopimended that the project applicant contact SJMSCP staff as early asPossible. After <br /> this project is'approved by the Habitat Technical Advisory Committee and the SJCOG Board, the <br /> following progess must occur to participate in the SJMSCP: <br /> (1) Schedule�a SJMSCP Biologist to perform a pre-construction survey prior to any ground <br /> disturbance. <br /> (2) Sign andretum Incidental Take Minimization Measures to SJMSCP staff(given to the project <br /> applicant after the pre-construction survey is completed). <br /> (3) Pay the appropriate fee based on SJMSCP findings. <br /> (4) Receive fhe Certificate of payment to release the required permit. <br /> San Joaquin County's PA-09002911Laxsanaamporn <br /> Community Development Page 8 <br /> i <br />