Laserfiche WebLink
8) Adequate sanitary facilities shall be provided for the facility, per the requirements of Chapter 4 <br /> of the California Plumbing Code. <br /> 9) Pursuant to Section 422.4 of the California Plumbing Code, toilet facilities shall be accessible <br /> to employees at all times, should not be more than 500 feet from where employees are <br /> regularly employed and accessible by not more than one flight of stairs. The plans shall <br /> indicate the location of the toilet facilities and the travel distance from work areas. <br /> 10) This project will be required to comply with the Model Water Efficient Landscape Ordinance <br /> requirements of the California Code of Regulations, Title 22, Division 2, Chapter 2.7 <br /> 11) Permits for temporary tents shall be obtained from City of Stockton Fire Department. <br /> 2. DEPARTMENT OF PUBLIC WORKS (Staff Contact:Alex Chetley, [209]468-3000). <br /> a. The -developer shall- provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six(6)foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more. Required retention basin capacity <br /> shall be calculated and submitted along with a drainage plan for review and approval, prior to <br /> release of building permit. (Development Title Section 9-1135) <br /> b. The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and payable <br /> at the time-of-building permit application.The fee will be based on the current schedule at the time <br /> of payment. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. (Resolutions R-00-433) <br /> c. The Regional Transportation Impact Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current schedule at <br /> the time of payment. (Resolution R-06-38) <br /> d. A copy of the Final-Site Plan shalt be submitted prior to release of building permit. <br /> e. The proposed project disturbs less than one (1) acre of ground and is not part of a larger plan of <br /> common development. The construction phase of the proposed project shall follow best <br /> management practices as maybe appropriate to minimize the discharge and transport of pollutants. <br /> (Title 5-Health and Sanitation, Division 10-Storm Water Management and Discharge Control) <br /> Informational Notes: <br /> 1) A Solid Waste Diversion Plan for all applicable projects must be submitted to the Building <br /> Division of the Community Development Department prior to issuance of the building permit. <br /> Contact the Solid Waste Division (468-3066)for information. <br /> 2) This property is subject to the requirements of San Joaquin County Mosquito &Vector Control <br /> District (209-982-4675) and the California Health and Safety Code for the prevention of <br /> mosquitoes. Best Management Practices(BMP)guidelines for storm water devices, ponds and <br /> wetlands are available. <br /> 3) All future building permits for projects located within a Special Flood Hazard Area at the time <br /> of permit issuance shall meet the San Joaquin County flood hazard reduction requirements <br /> (Title 9, Chapter 9-1605)and all requirements of the State of California (CCR Title 23)that are <br /> in force at the time of permit issuance. As an example, these requirements may include raising <br /> the finish floor elevation one foot above the expected flood level and/or using flood resistant <br /> materials. <br /> PA-1600266 Conditions of Approval <br />