Laserfiche WebLink
fo�aoc� • W. Department of Public Works <br /> SAN�eJOAQU <br /> 2 IN Kris Balaji,Director of Public Works <br /> L i � COUNTY— n Fritz Buchman,Deputy Directorroevelopment <br /> Greatness grows here. - Michael Selling,Deputy DirectorlEngineering <br /> Working foe YOU Jim Stone,Deputy Director/Operations <br /> June 25,2018 Krlstl Rhea,Manager of Strategic Initiatives <br /> MEMORANDUM <br /> TO: Community Development Department <br /> CONTACT PERSON: Giuseppe Sanfilippo (� <br /> FROM: Alex Chetley, Engineering Services Manager (� <br /> Development Services Division <br /> SUBJECT: PA-1600266;A Use Permit application for the expansion of an existing 4,311 square foot <br /> neighborhood religious assembly facility for a maximum of 120 attendees. The project <br /> includes the construction of a 4,183 square foot dormitory building with a kitchen and <br /> fellowship hall for visiting monks,and the addition of two 400 square foot storage containers. <br /> The project also includes three temporary tents totaling 4,420 square feet to be used seasonally. <br /> No change is proposed to the maximum number of attendees; located on west side of Thornton <br /> Road,2,630 feet north of Eight Mile Road, Stockton. (Supervisorial District 3) <br /> PROPERTY OWNER Phrabuddhivongsamunee Buddhist Temple APPLICANT:David Miraflor <br /> ADDRESS: 11241 Thornton Road, Stockton APN: 055-200-03 <br /> INFORMATION: <br /> The site is not currently located within a Federal Emergency Management Agency Designated Flood <br /> Hazard Area. <br /> Thornton Road has an existing right-of-way width of 95 feet(55 feet west of centerline)and a planned <br /> right-of-way width of 110 feet. <br /> RECOMMENDATIONS: <br /> I. The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six(6)foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more. Required retention basin capacity shall <br /> be calculated and submitted along with a drainage plan for review and approval,prior to release of <br /> building permit.(Development Title Section 9-1135) <br /> 2. The Traffic Impact Mitigation Fee shall be required for this.application. The fee is due and payable <br /> at the time of building permit application. The fee will be based on the current schedule at the time <br /> of payment. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. (Resolutions R-00-433) <br /> 1810 East Hazelton Avenue I Stockton, California 95205 1 T 209 468 3000 1 F 209 468 2999 <br />