Laserfiche WebLink
c. Dedication to result in a.55466t-wide right-of-way from the centerline of Thornton Road to the <br /> property line shall.be required acrossthe frontage'of APN.055=200=03. Dedication shall be made by <br /> a separate instrument. Related fees shalibe,paid prior to building`permit release. (Development <br /> Title Section 9-1150:5} <br /> d. The-'-frontage'improvemerits for Thornton Road shall be constructed with the standards for one-half of <br /> a 11 Orfoot wide right of-way mayor artenal road."The construction of the frontage improvements will <br /> be deferred upon execution by the-6'owner of a Deferred frontage and Roadway Improvement <br /> Agreement 'nbr to aroval of the Improvement.Plan. A$740:00 fee currently is required for <br /> Pp <br /> processing;per Development Title Table 9=240.2, in addition to a copy of the Grant Deed and an <br /> estimate for the required frontage improvements:'The estimate shall be prepared by a registered <br /> civil engineer with a typical section drawing on a form to be,supplied by Public Works for approval. <br /> As an.option;Public Works will prepare the drawing and estimate for an additional fee of$315.00. <br /> The fee due will be based on the.current fee schedule. (Development Title Section 9-1150.2) <br /> e. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable <br /> at the time of building permit application. `The,fee currently is$1446_.00 per 1,000 gross square feet <br /> of building designated as Service Comrhercial in the Stockton area. The fee shall be automatically <br /> adjusted July'1 of each year by the Engineeting Construction Cost Index as published by the <br /> Engineering News Record. (Resolution R-00 433) <br /> f. The Water Supply.Facilities Impact Mitigation Fee shall be required for this development. The fee is <br /> -due and payableprior to issuance ofbuilding permits. The fee currently is$595.00 per 1,000 gross <br /> square feet of building designated as Service Commercial. The-fee shall be automatically increased <br /> on January 1 of each year through the year.2005 at the-rate of 7.66 percent. A credit may be <br /> allowed if it can be verified that the existing development on this site was in operation on or after April <br /> 30, 1991. (Development Title Section 9-818.4, Resolution R-97-5) <br /> I <br /> g. The Regional Traffic Impact Fee shall be required for this development. The fee is due and payable <br /> at the time of building permit application. (Resolution R-06-38) <br /> I <br /> h. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> i. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> met the requirements of the Waste Pian Format for Development Projects. The Final Site Plan is <br /> required upon submittal of verification. ' <br /> I <br /> NOTE: Any construction activity that results in the disturbance of at least one acre of soil shall require a <br /> State NPDES construction permit. i <br /> 3. ENVIRONMENTAL HEALTH DEPARTMENT(Staff Contact: Michael Escotto,468-3443) <br /> a. The Environmental Health Department requires a soil suitability/nitrate loading study, incorporating <br /> proposed staff and parishioners,which indicates that the area is suitable for septic tank usage. This <br /> must be performed prior to the issuance of building permits(Development Title Section 9-1105.2[d]). <br /> A review fee of$465.00 must be paid at the time of submittal to the Environmental Health <br /> Department. <br /> The sewage disposal system shall comply with the on-site sewage standards of San Joaquin County <br /> prior to approval. A percolation test that meets absorption rates of the manual of septic tank practice <br /> or the EPA Design Manual for on-site waste water treatment and disposal systems is required for <br /> each parcel_ A permit fee of$93.00 per percolation hole is required. <br /> Conditions of Approval -3- PA-0600020 <br />