Laserfiche WebLink
Raymond Hoo. _2_ F <br /> COM1v1UNITY'DEVELOPSIENT " <br /> PA-06-020`(UP) <br /> E <br /> A. The'frontage tmprovetirients for.Thornton road shall be coiastructed rn'conforinance with the standards for <br /> . . <br /> one-half of a one-hundred-ten`(1.1`0)foot rightof.way.major arterial road.-The construction of the frontage <br /> improvements will be deferred upon execution by the owner of a Deferred Frontage and Roadway <br /> ir.,provement Agreement pnorao approval of Improyemerit Plan: (A $740.00 fee currently,is required for <br /> processing per.Development Title Table 9-240.2 in additioa,to a.copy.of the Grant Deed andran_.estimate for <br /> the required frontage improvements.. .The estimate:shalI be:prepared by iregisiered civil engineer witha <br /> t ' cal <br /> yp section.drawing ori a forrri to be supplied by the Department of Public Works for approval. As an <br /> option, the Department of Public Works will prepare the drawing and estimate for an additional fee of <br /> $315.00.) (The fee due will be based on the current fee schedule.) <br /> (Development.Ti.tle Section 9-1150.2) <br /> 5. The Traffic Impact Mitigation Fee shall lie required for this development. The fee is due and payable at the <br /> tinie of building permi't.Application. (The,fee currently is $ 1446 per 1000 gross square.foot of building <br /> designated as Service Corn in the Stockton area. The fee shall be automatically adjusted July 1 of each year <br /> by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolutions R=00-433) <br /> 6. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable prior to issuance of the building permit. (The fee currently is$595 per 1,000 gross square foot <br /> of building designated as Service Com. The fee shall be automatically increased on January 1 of each year <br /> through the year 2005 at the rate of 7.66 percent. A credit may be allowed if it can be verified that the <br /> existing development on this site was in operation on or after April 30,1991.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 7. Regional Traffic Impact shall be required for this development. The fee is due and payable at the time of <br /> building permit application. (Resolutions R-06-38) <br /> 8. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 9. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification: <br /> Note: Any construction activity that results in the disturbance of at least one (1) acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:DG: <br /> PICOMMENMUMYR 2006%PA-0600020.wpd <br /> Y <br />