Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> SA-92-12 PRE-APPLICATION <br /> 3 . Encroachment permit shall be required for work within road <br /> right-of-way. <br /> (Streets and Highway Title Section 10-3103) <br /> 4 . Terminal Drainage system with detention pond for metering <br /> storm drainage runoff shall be required. <br /> (Planning Title Section 9-10002 , 9-10003) <br /> 5. Public water and sanitary sewer services shall be required. <br /> (Planning Title Section 9-10002 , 9-10003) <br /> c: Manuel Lopez <br /> Deputy Director/Development <br /> 2 <br />