Laserfiche WebLink
Table 3 <br /> Love's Travel Stops and Country Stores <br /> DEIR Alternatives Analysis <br /> Detailed Economic Impacts of Project Construction(Rounded 2012$) <br /> Total <br /> Impact Type One Time <br /> Activityflmpact Categories Direct Indirect Induced [11 Impact <br /> Project Construction Costs[2] <br /> Site Improvements $4,862,000 <br /> Structures $2,280,000 <br /> Subtotal Project Construction Costs $7,142,000 <br /> Soft Costs $450,000 <br /> Total Project Construction Costs $7,592,000 <br /> San Joaquin County Output[31 <br /> Industry Output(excl.Income) $4,135,000 $1,008,000 - $5,143,000 <br /> Income[4] $3,007,000 $585,000 - $3,592,000 <br /> Total Output $7,142,000 $1,593,000 - $8,735,000 <br /> County Employment <br /> (Jab years)151 45 10 - 55 <br /> Source: IMPLAN;Love's Travel Stops and Country Stores; EPS. <br /> [1] Note that total construction impacts include direct and indirect impacts only;induced impacts were not <br /> estimated because construction activities are temporary and thus are not anticipated to generate net new <br /> household expenditures in the local economy. <br /> [2] Project construction costs of$7.6 million(rounded to the nearest thousand)provided by Love's Travel Stops and <br /> Country Stares. Soft costs(e.g.,architecture,engineering)of$450,000 are excluded in estimated direct <br /> construction impacts. Instead,these costs are captured in the indirect outputs. <br /> [3] Analysis based on San Joaquin County data. Output is the amount of business expenditures on goods and <br /> services retained in the local economy. <br /> [4] Includes employee compensation,proprietors Income,and other income(industry profits,rents,and royalties). <br /> [5] Employment includes both full-time and part-time workers. Job years refer to the number of jobs in each year <br /> summed over the entire period of construction. <br /> Prepared by EPS 12&2013 <br /> EXHIBIT 1 <br />