Laserfiche WebLink
P.03 <br /> Feb-19-03 04:49P <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> •4�'" SAN JOAQUIN COUNTY <br /> Une!Supervixo►s <br /> Donna K.Herrn,tt.E.H.S. 3U4 Last Weber Avenue,Third Ploar Carl Horsman,R.C.I1.S. <br /> =� DimforMikc Huggins,K.E.LLS.,R.n.l. <br /> Al Mcn,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.r•..H.S, <br /> • �. ►- Program Manager Telephone: (209) 468-3420 Marguct Lagoria,R.C.11.5. <br /> Lourie A.Cutullr,it.E.H.S. Koben McClellm,R.r•:.H.S. <br /> HroRram Manager Fax: (209)464-0138 Murk nurccllua.R.E.H.S. <br /> February 19,2003 <br /> TO: San Joaquin County <br /> Community Development Department <br /> FROM: San Joaquin County <br /> Environmental Health Department <br /> CONTACT PERSON: Raymond Borges. Lead Senior R.E.H.S., R.D.I. <br /> PHONE NUMBER: (209) <br /> 468-3284 <br /> RE: PA-03-29 (SA),Attention: i.canne Mueller <br /> 26440 North Thornton !toad, Thornton <br /> The Environmental Health Department huff the following concerns on this pre-application that <br /> need to be addressed: <br /> A. The project shall be served by a public sewer collection and treatment system constructed in <br /> conformance with the requirements of the San Joaquin County Environmental Health <br /> Department and the Department of Public Works. A wastewater treatment plant study <br /> acceptable to San Joaquin County Environmental IIealth Department and the Department of <br /> Public Works is required prior to the approval of the improvement plans of any work within <br /> the site. Applicant's site plan failed to show a proposed a septic system liar this project. <br /> Environmental Health Department cannot support an onsite septic systemn for this type of <br /> high volume waste based on Environmental Health Department experience. In addition,PA- <br /> 02-247 has a similar proposal next dolor. Per the San Joaquin County Development Title, <br /> Section 9-1105.7,this development will require a public wastewater disposal system. <br /> B. Obtain discharge requirements from the California Regional Water Quality Control Board, <br /> Central Valley Region,prior to development(Water Code, Article 5,Section 13280). <br /> C. A State certified operator is required to operate the wastewater treatment plant with the <br /> appropriate Grade level according to San Joaquin County regulations and state laws(San <br /> Joaquin County Development"Title, Section 9-1110.5). <br /> D. Environmental I lenith Dcparunent requires connection to an approved public water supply <br /> system(San Joaquin County Development Title, Section 9-1120.2). On an interim basis,the <br /> water system may be privately operated,but it must be designed and constructed for <br /> conversion to a public system and be operated by State-licensee!perKnnnel on the site. The <br /> test well will be required to meet the following conditions: <br /> Page 1 ort <br />