Laserfiche WebLink
He in turn referred me to Bernie Dietz who installs these system is the area. <br /> discussed the matter with Dietz and he fully explained the system and that it had <br /> been approved for use in the County. <br /> I later contacted Mike Smith and learned that you had approved the system, but <br /> with additional throughput gallon requirements for the site, which in turn enlarged <br /> the original system, which was proposed for the site. <br /> My concern is the original requirements for a water treatment system as <br /> explained by Mr. Borges and discussed with people in the industry would run in <br /> excess of $400,000, should this be the requirement our project would not be at <br /> all financially viable. But, on the other hand the Micro Septic System based on <br /> my discussions with Bernie Dietz could be installed in the neighborhood of <br /> $ 80,000 to $ 100,000, which now makes our project viable. <br /> Mike Smith told me that Micro Septic system was approved for Mr. Singh's <br /> project. As that project is in the exactly the same area and almost exactly the <br /> same in scope of operation that this system, based on the County's review we <br /> would assume that the Micro Septic system would be approved for the Ramos <br /> project as well. <br /> The other issue was the availability of water service. We had proposed Thorton <br /> would provide water service as part of CSA 12. Mike informed me that Singh <br /> water service was connecting to CSA 12. <br /> 1 would appreciate a response to my letter and direction on what will be required <br /> so we can determine how to proceed from this point forward. <br /> Thank vou for your assistance. <br /> R sp cfti'l ly <br /> Rust Firenze <br /> Consultant for Ramos Oil Co. <br /> Cc: Kent Ramos <br /> President <br /> Ramos Oil Co. <br />